Culvert Replacement - Stannard Mountain Road - Stannard , VT
One of 1,967 tenders Taiyo tracks in Vermont.
Source: Vermont Purchasing Group
He project includes the removal of the existing 12 . 8 ' wide by 8 . 3 ' high corrugated metal arch culvert , stone masonry headwalls , concrete apron , overlay , and abutments , and the installation of a 34 ' L x 20 ' W prestressed precast concrete deck beam bridge placed on precast concrete pedestal abutments wi
- Status
- Closed
- Sector
- Metal, Bridge, Road, Cement
- Location
- Vermont, United States of America
- Updated
- 3 Nov 2026
- Source
- Vermont Purchasing Group
ConstructChat
Ask ConstructChat about Culvert Replacement - Stannard Mountain Road - Stannard , VT
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | He project includes the removal of the existing 12 . 8 ' wide by 8 . 3 ' high corrugated metal arch culvert , stone masonry headwalls , concrete apron , overlay , and abutments , and the installation of a 34 ' L x 20 ' W prestressed precast concrete deck beam bridge placed on precast concrete pedestal abutments with precast concrete wingwalls . The project will include the installation of 68 LF of bridge guardrail and 100 LF of approach guardrail . Abutments will be installed on top of poured - in - place concrete leveling pads doweled to bedrock . Work will include placement of leveling pads , abutments , and wingwalls , placement of channel bed material to create a new bankfull channel beneath the bridge , placement of bank rock to create wildlife benches and protect sub - structures , and all associated road , bank , river and erosion control work . Flow bypass will be achieved with a pump providing bypass flow around the project area and discharging downstream of the work , such that the majority of culvert work will be performed during low to no flow . |
Location
Country | United States of America (USA) |
State | Vermont |
Source
Source | Vermont Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Metal, Bridge, Road, Cement |
Article published date | 2026-04-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Metal tenders in United States of America
- Token Creek Roof Replacements
- HVAC Ice Machine Servicing and Sheet Metal Fabrication
- Jail Courthouse Walkway Project
- RFP 887702021MF Rapid Response Fire Boat for Norfolk FireRescue
- Various Locations Sewer Replacement No. 9 [BID TABULATION]
- Millbrae Warehouse Loading Dock Repair
- Biosolids Digester Facilities - Southeast Treatment Plant T-...
- Electrical (C-10 License), San Francisco, San Mateo, Santa C...
