CWS Circulating Water Pumps (Concrete Volute)
Sector: Water Supply and Storage • Location: Lubiatowo Kopalino, Poland
Source: TED Europa
The scope of work for this package consists of design, furnish material, fabricate, test, and deliver (9) vertical concrete volute pumps (based on U.S. and European Materials, Codes and Standards) for each of the three nuclear power plants (NPPs) planned for the Poland AP100 Project. The Circulating Water Concrete Volute Pump, pumps brackish Baltic Sea water to remove heat from the main condensers
- Status
- Closed
- Sector
- Water Supply and Storage, Manufacturing (Industrial), Power Generation (CCGT), Nuclear, Cement, Commercial
- Location
- Lubiatowo Kopalino, Poland
- Updated
- 3 Nov 2026
- Source
- TED Europa
ConstructChat
Ask ConstructChat about CWS Circulating Water Pumps (Concrete Volute)
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | contract notice |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | The scope of work for this package consists of design, furnish material, fabricate, test, and deliver (9) vertical concrete volute pumps (based on U.S. and European Materials, Codes and Standards) for each of the three nuclear power plants (NPPs) planned for the Poland AP100 Project. The Circulating Water Concrete Volute Pump, pumps brackish Baltic Sea water to remove heat from the main condensers in a once through cooling system configuration. There are 9 total concrete volute pumps for the project site (3 x 33% per unit) with a rated flow of 21.3 m3/s (76,668 m3/hr), pump head of 22.5m, and design life of 60 years. There shall be physical model testing and shop performance testing on the pump. NOTE: The estimates provided above are APPROXIMATE only. The intent is to give bidders an idea of the scale of the project. Deadline (Pre-qualification Submittal): September 2026 (Forecast – Subject to change) RFQ Document Issuance: November 2026 (Forecast – Subject to change) Supplier Proposals Due: January 2027 (Forecast – Subject to change) Order Award Date: April 2027 (Forecast – Subject to change) * After completion of the design submittals, the company is placed on hold until release for fabrication. The timing of the release is based on required fabrication and delivery lead times. Required Onsite Date: Unit 1: June 2032 (Forecast – Subject to change) Unit 2 & 3 will be further detailed in the RFQ package. |
Original sector | Construction work |
Location
Country | Poland |
City | Lubiatowo Kopalino |
Source
Source | TED Europa |
URL |
More Details
Record type | Tender |
Sector | Water Supply and Storage, Manufacturing (Industrial), Power Generation (CCGT), Nuclear, Cement, Commercial |
Article published date | 2026-07-20 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Water Supply and Storage tenders in Poland
- Dostawa 80 Mg flokulantu w postaci emulsji do wspomagania procesu odwadniania osadów z Oczyszczalni Ścieków w Szlachęcinie, Mosinie i Borówcu.
- Dostawa urządzeń ogólnolaboratoryjnych w podziale na pakiety, znak sprawy: AEZ/S-056/2026
- Renowacja bezwykopowa burstlining kanału sanitarnego DN 500 ul. Dojlidy Fabryczne w Białymstoku
- Modernizacja pięciu punktów pomiarowych zamontowanych na magistralach wodociągowych, zlokalizowanych na terenie m. st. Warszawy, z podziałem na Zadania
- Opracowanie Projektu Strefowania i dokumentacji projektowej dla Zadania „Opomiarowanie sieci w terenie – wykonanie 24 szt. nowych punktów pomiarowych na sieci wodociągowej m.st. Warszawy i Pruszkowa”
- Budowa ujęcia SUW Święcice
- Zaprojektowanie (w zakresie branży srk) i kompleksowe wykonanie robót budowlanych na linii kolejowej nr 622 na odcinku G Gdów – Szczyrzyc w ramach Projektu pn. „Budowa nowej linii kolejowej Podłęże – Szczyrzyc – Tymbark / Mszana Dolna oraz modernizacja istniejącej linii kolejowej nr 104 Chabówka – Nowy Sącz – Etap II”
- Wykonanie robót budowlanych FAZY I na parkingu Parkuj i Jedź P+R Połczyńska w Warszawie