logo

DA from NEPO212 for Billingham Sport Hub, Mechanical & Electrical Engineer

The scope, dates and status of this tender. A free account opens every field.

Source: Open Contracting Data Standard (OCDS)

Tender
Complete

In January 2024 Alliance Leisure Services Limited, who are the Development Partner on the UK Leisure Framework, were appointed after being recommended as an appropriate and compliant delivery route by the Football Foundation. The UK Leisure Framework allows for direct appointment of the professional team and main contractor and as such, Universal Group were appointed to design and construct Billin

Status
Closed
Sector
Road
Location
United Kingdom
Updated
3 Nov 2026
Source
Open Contracting Data Standard (OCDS)

ConstructChat

Ask ConstructChat about DA from NEPO212 for Billingham Sport Hub, Mechanical & Electrical Engineer

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “DA from NEPO212 for Billingham Sport Hub, Mechanical & Electrical Engineer” is a tender record in Taiyo, linked to the Road sector. It is issued for works, goods, or services related to United Kingdom.

Participants

Not available for this record.

Status

Original status

complete

Taiyo status

Closed

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

In January 2024 Alliance Leisure Services Limited, who are the Development Partner on the UK Leisure Framework, were appointed after being recommended as an appropriate and compliant delivery route by the Football Foundation. The UK Leisure Framework allows for direct appointment of the professional team and main contractor and as such, Universal Group were appointed to design and construct Billingham Sports Hub. The outcome of this means an alternative procurement route is sought and it is now essential that the shortcomings identified during the initial commission are not repeated through this new prcurement exercise. The proposed procurement approach has been specifically chosen to strengthen quality assurance, improve design coordination, and provide greater oversight throughout the project lifecycle, ensuring a more robust and deliverable outcome. It is necessary to appoint a suitably qualified and experienced multidisciplinary consultant team to develop, coordinate and finalise the technical design, ensuring a fully integrated and deliverable scheme across the site. Given the complexity of both the project and the site, it is essential that the appointed consultants demonstrate strong design coordination and project integration capabilities, with a proven track record of successfully delivering complex schemes with the Council. These skills and experience were not sufficiently evident within the previous procurement arrangement and are therefore a critical requirement for the re-procurement process to ensure a coordinated, robust and deliverable design solution.

Location

Country

United Kingdom (UK)

Source

Source

Open Contracting Data Standard (OCDS)

URL

More Details

Record type

Tender

Sector

Road

Article published date

2026-11-02

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender