Damboard Replacement Project - Re-design of Stop Log support structures

Location: United Kingdom

Source: Open Contracting Data Standard (OCDS)

Tender
Complete

This contract serves as an exemption and is outside of normal HBC Contract Procedure Rules. The Damboard Replacement Project began in 2021 and original optioneering was carried out by Beckett Rankine. Beckett Rankine completed a detailed design in 2024 and it was recommended to carry out Ground Investigation work. This was delayed until 2025 as the estimate for the cost of the stoplogs was well in

Status
Closed
Location
United Kingdom
Updated
3 Nov 2026
Source
Open Contracting Data Standard (OCDS)

ConstructChat

Ask ConstructChat about Damboard Replacement Project - Re-design of Stop Log support structures

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “Damboard Replacement Project - Re-design of Stop Log support structures” is a tender record in Taiyo. It is issued for works, goods, or services related to United Kingdom.

Participants

Not available for this record.

Status

Original status

complete

Taiyo status

Closed

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

This contract serves as an exemption and is outside of normal HBC Contract Procedure Rules. The Damboard Replacement Project began in 2021 and original optioneering was carried out by Beckett Rankine. Beckett Rankine completed a detailed design in 2024 and it was recommended to carry out Ground Investigation work. This was delayed until 2025 as the estimate for the cost of the stoplogs was well in excess of the available budget and a decision by the board was needed to re-establish the project strategy. Following the completion of the ground investigation work it was proposed to appoint marine engineering consultants to advise on a pre-construction agreement process, but the projected costs combined with a reduction in the budget meant that the majority of the revised budget would be spent on fees. As it is now proposed to carry out soft market testing of the stoplog solution, it is necessary, in order to obtain accurate and reliable estimates from contractors, to have a detailed design that could be implemented as otherwise the estimates will be subject to too many caveats and assumptions to make them worthwhile. As Beckett Rankine have carried out all the marine engineering consultancy and design work on the project to date they are in a position to carry out the design amendment work most cost-effectively and rapidly.

Location

Country

United Kingdom (UK)

Source

Source

Open Contracting Data Standard (OCDS)

URL

More Details

Record type

Tender

Article published date

2026-03-16

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender