David Court Waterline , Storm Drainage & Paving Upgrades Project
Bids closed Apr 2026 · Washington · Last reported Mar 2026
Source: Washington Purchasing Group
The work for the Waterline Upgrade includes installation of new 8 - inch and 12 - inch waterlines totaling 1 , 633 linear feet in 26th Street East and Berry Lane East . There will be three points of connection . Two connections will be made in David Court East and one connection will be made within the
- Status
- Closed
- Sector
- Waste Processing and Treatment, Metal, Water Supply and Storage, Residential, Road
- Location
- Washington, United States of America
- Updated
- 3 Nov 2026
- Source
- Washington Purchasing Group
ConstructChat
Ask ConstructChat about David Court Waterline , Storm Drainage & Paving Upgrades Project
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | The work for the Waterline Upgrade includes installation of new 8 - inch and 12 - inch waterlines totaling 1 , 633 linear feet in 26th Street East and Berry Lane East . There will be three points of connection . Two connections will be made in David Court East and one connection will be made within the public easement located immediately west of the terminus of 26th Street East . Three new fire hydrants will be installed , and seventeen residential water services will need to be reconnected . The existing 6 - inch asbestos water main will be abandoned in place except where it conflicts with new improvements . The work for the Storm Drainage Upgrade includes the installation of 177 linear feet of 8 - inch diameter ductile iron storm sewer pipe , 440 linear feet of 12 - inch diameter ductile iron storm sewer pipe , fourteen Type 1 catch basins , a stormwater treatment vault , and roadside swales . These upgrades will be in the right - of - way of the following roads : Berry Lane East , David Court East and 27th Street East . The work for the Paving Upgrade includes a combination of full depth Hot Mix Asphalt pavement and base replacement , and a 2 - inch Hot Mix Asphalt Overlay . The project will utilize approximately 1 , 450 tons of Hot Mix Asphalt , and approximately 1 , 140 tons of Crushed Surfacing Base Course . 3 , 700 square yards of existing bituminous pavement will be removed |
Location
Country | United States of America (USA) |
State | Washington |
Source
Source | Washington Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Waste Processing and Treatment, Metal, Water Supply and Storage, Residential, Road |
Article published date | 2026-05-14 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Waste Processing and Treatment tenders in United States of America
- Coatings for Wet Well and Manholes
- Sole Source for Wedeco UV BulbsBallets
- Chambers Creek Regional Wastewater Treatment Plant BNR Aeration Basin Airflow Meters
- Annual Construction Contract For Utility Replacement 2022A
- FY23 Sewer Rehabilitation
- Fire Station 32 ADA Restroom Improvements
- Foothills Trail East Puyallup McMillin Trailhead Improvements
- Pipeline Trail Phase 1 Project
