Db01--Shuttle Transportation Management Application Amendment Questions And Answers
The scope, dates and status of this tender. A free account opens every field.
Source: SAM.gov
Shuttle Transportation Management Application 36C25226Q0191 Questions & Answers The description in the provided doc states the requirement "Quick installation with no wiring modifications required , but we are wondering if the device will have access to the OBD-II port for power (or otherwise rely on its own battery)? The device will need to be plugged into the vehicle s OEM port. Will all 10 GPS
- Status
- Closed
- Sector
- Energy Storage, Hospital, Road, Automotive, Power Generation (CCGT), Residential, Commercial
- Location
- Chicago, Illinois, United States of America
- Updated
- 3 Nov 2026
- Source
- SAM.gov
ConstructChat
Ask ConstructChat about Db01--Shuttle Transportation Management Application Amendment Questions And Answers
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | combined synopsis/solicitation |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | Shuttle Transportation Management Application 36C25226Q0191 Questions & Answers The description in the provided doc states the requirement "Quick installation with no wiring modifications required , but we are wondering if the device will have access to the OBD-II port for power (or otherwise rely on its own battery)? The device will need to be plugged into the vehicle s OEM port. Will all 10 GPS tracking devices be deployed at Jesse Brown VAMC only, or should the solution be architected with anticipated expansion to additional shuttles or facilities within VISN 12? Deployed at Jesse Brown Shuttles only. Are there specific operational challenges you are most focused on resolving (for example, long or unpredictable wait times, difficulty communicating route changes, accessibility concerns, or limited visibility for dispatch)? No foreseen challenges since the shuttles already maintain a communication system application will augment the system in place for better communication with riders. Are there key performance indicators (such as on time performance, average rider wait time, or shuttle utilization) that you would like the contractor to measure and report routinely? Yes Who is the incumbent? New requirement Are there site access, badging, or security onboarding steps that could affect the 30-day delivery and full operational capability schedule? No Approximately how many VA staff members do you anticipate using the administrative dashboard, and do you have a preferred format for training (virtual, on site, recorded modules) and timing (business hours vs. off peak)? ~28 Residents No training is planned. The app is self-explanatory. Should the solution integrate with any existing VA systems (such as transportation scheduling tools, facilities dashboards, or other VISN wide platforms), or do you currently envision a stand-alone system? No. This system is strictly stand-alone. Are there required export formats or reporting cycles (e.g., monthly or quarterly summaries, CSV/Excel exports) we should plan to support out of the box? There will be an internal summary kept for Fleet Department purposes only. In addition to the VAAR 852.239 series clauses cited in the RFQ, are there specific VA security templates or processes (e.g., security questionnaires, System Security Plan format, or an established path to ATO for similar SaaS solutions) that you expect the selected contractor to follow? No Can you confirm whether the VA is seeking a rider application limited to fixed-route shuttle tracking and ETA visibility, or if there is any expectation for on-demand ride requesting or dispatch functionality as part of this RFQ? There is no expectation for on-demand ride requesting. The shuttles run on fixed routes and schedule. The solicitation specifies a quantity of 10 GPS tracking devices. Should this be interpreted as supporting up to 10 trackable (online) vehicles, with no additional requirement for a minimum number of concurrently operating vehicles? Yes, this should be interpreted as supporting 10 trackable vehicles with no additional requirement at this time. Are shuttle routes and stops expected to be predefined and static, or should the proposed solution support frequent route or stop adjustments by administrative users? Shuttle routes and stops expected to be predefined and static. Should the rider application strictly provide real-time vehicle location, ETA at stops, and notifications, or is there interest in future optional capabilities such as ride requests or stop selection, even if not required for award? Strictly provide real-time vehicle location, ETA at stops, and notifications, no other capabilities are required currently. |
Original sector | Information |
Location
Country | United States of America (USA) |
State | Illinois |
City | Chicago |
Source
Source | SAM.gov |
URL |
More Details
Record type | Tender |
Sector | Energy Storage, Hospital, Road, Automotive, Power Generation (CCGT), Residential, Commercial |
Article published date | 2026-01-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Energy Storage tenders in United States of America
- HOUSEHOLD SINGLEUSE RECHARGEABLE BATTERY COLLECTION AND RECYCLING SERVICES
- BATTERIES FOR SURVEILLANCE EQUIPMENT
- Southeast Water Pollution Control Plant Power Feed and Prima...
- Flashlights and Batteries
- IFB 970302022LW Flashlights and Accessories
- Power Utility Rate Consulting Services for 2021 Electric Rates Study
- RFP - Portable Mass Spectrometer Device
- Southeast Water Pollution Control Plant Power Feed and Prima...
