logo

Dcv Gelberman Shipyard Repairs

Sector: Power Generation (CCGT) • Location: Jersey City, New Jersey, United States of America

Source: SAM.gov

Tender
Combined Synopsis/Solicitation

AS OF 28 MAY 2026, AMENDMENT 0002 POSTED. OFFER DUE DATE HAS BEEN EXTENDED TO 05 JUNE 2026 AT 2:00PM EDT. AS OF 27 MAY 2026, AMENDMENT 0001 POSTED. OFFER DUE DATE REMAINS 29 MAY 2026 BY 2:00PM EDT. -------------------------------------------------------------------------------------------- Shipyard repair services for the Drift Collection Vessel Gelberman The work consists of furnishing all labor,

Status
Prospective
Sector
Power Generation (CCGT), Aerospace & Defense, Steel, Seaport, Commercial, Residential, Water Supply and Storage
Location
Jersey City, New Jersey, United States of America
Updated
3 Nov 2026
Source
SAM.gov

ConstructChat

Ask ConstructChat about Dcv Gelberman Shipyard Repairs

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “Dcv Gelberman Shipyard Repairs” is a tender record in Taiyo, linked to the Power Generation (CCGT) sector. It is issued for works, goods, or services related to Jersey City, New Jersey, United States of America.

Participants

Not available for this record.

Status

Original status

combined synopsis/solicitation

Taiyo status

Prospective

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

AS OF 28 MAY 2026, AMENDMENT 0002 POSTED. OFFER DUE DATE HAS BEEN EXTENDED TO 05 JUNE 2026 AT 2:00PM EDT. AS OF 27 MAY 2026, AMENDMENT 0001 POSTED. OFFER DUE DATE REMAINS 29 MAY 2026 BY 2:00PM EDT. -------------------------------------------------------------------------------------------- Shipyard repair services for the Drift Collection Vessel Gelberman The work consists of furnishing all labor, materials, fittings, equipment, tools, power, heat, water, etc., and performing all work on U.S. Drift Collection Vessel "GELBERMAN" specified herein. The principal dimensions and physical data for the vessel are shown below: GENERAL DESCRIPTION Length Overall............................................... 85'?0" Breadth, Molded............................................ 26'?0" Depth, Molded............................................... 10’-0” Material.......................................................... All Welded Steel Displacement, light........................................ 213 short tons Propellers (2)................................................. 64"Dx52"P, 4 blade Draft, loaded, aft........................................... 8'-6” Hull Form....................................................... Monohull/Keel Coolers ABS I.D. No.................................................. 8004533 The major work scope includes drydocking the vessel, cleaning and painting the hull, assisting with ABS and USCG required inspections, and miscellaneous modifications and repairs in accordance with these specifications. The work scope also includes various items required to satisfy the requirements of Annual Hull and Machinery Surveys. The Contractor shall be responsible for the costs associated with providing the inspection services of ABS[JHA1] [JC2] . Wherever the term "Plant" is used in these specifications, it is understood to refer to the items of floating plant named in this paragraph, together with their normal appurtenances, equipment, and supplies. General vessel arrangements and details are included in the attached file named “Reference Drawings[JHA3] [JC4] ”. The accuracy of these drawings has not been verified. Therefore, the Contractor shall template all work from the vessel. The Contractor shall furnish the necessary facilities for and shall bear the expense of any movement of the plant while it is in his or her possession. Removal and/or relocation of any parts, equipment, fluids, etc. for interference or access shall be the responsibility of the Contractor. Similarly, all interference and access removals shall be reinstalled by the Contractor at his/her expense. Any damage from removal or relocation of parts, equipment, etc. shall be repaired or replaced at the Contractor’s expense. The Contractor's work shall comply with ABS "Rules for Building and Classing Steel Vessels" and USCG "Rules and Regulations for Subchapter I, Vessels" as found in the Code of Federal Regulations (Title 46, CFR). [JHA1]When are we paying for al ABS inspections? [JC2]Shipyard handles fees, do we need a NTE Value [JHA3]Gelberman doesn’t have a file called “Refrence Drawings” We need a document or contract section that lays out all of the drawing numbers and titles that are being provided so that we know we have supplied the correct drawings. [JC4]Reference Drawings File is what is posted to Sam.gov it will be a zip file with the drawings we want to include in the solicitation.

Original sector

Not Identified

Location

Country

United States of America (USA)

State

New Jersey

City

Jersey City

Source

Source

SAM.gov

URL

More Details

Record type

Tender

Sector

Power Generation (CCGT), Aerospace & Defense, Steel, Seaport, Commercial, Residential, Water Supply and Storage

Article published date

2026-05-29

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender