DEC - Electrical Maintenance Plan Implementation
Sector: Power Generation (CCGT) • Location: Nebraska, United States of America
Source: Nebraska Purchasing Group
The contractor shall provide a NETA certified technician ( s ) to clean , inspect , and test electrical equipment in the identified facilities . All testing will be performed in reference to the ANSI / NETA MTS - 2023 Standard for Maintenance Testing Specifications for Electrical Power Equipment and Systems . The device
- Status
- Closed
- Sector
- Power Generation (CCGT)
- Location
- Nebraska, United States of America
- Updated
- 3 Nov 2026
- Source
- Nebraska Purchasing Group
ConstructChat
Ask ConstructChat about DEC - Electrical Maintenance Plan Implementation
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | The contractor shall provide a NETA certified technician ( s ) to clean , inspect , and test electrical equipment in the identified facilities . All testing will be performed in reference to the ANSI / NETA MTS - 2023 Standard for Maintenance Testing Specifications for Electrical Power Equipment and Systems . The devices and required tests have been identified and are listed on the attached single line diagrams and device inventory lists . County Adult Detention Facility Protection Devices See attached bid reply form , device inventory , and single - line diagrams 013794 ( E - 0200 ) and 013808 for additional information . LES Operations Center Protection Devices See attached bid reply form , device inventory , and single - line diagram 015097 ( A - 0500 ) for additional information on the equipment to be tested and test procedures required by device . 2 . 0 Deliverables Contractor shall immediately communicate preliminary findings to the owner if unsafe conditions are identified . The final deliverable shall be a report for each facility containing the following information : Detailed equipment conditions including pass / fail assessment per NETA MTS criteria . Test equipment calibration records . Test procedures and data collected . Remedial actions taken , if any . Redlined single line diagrams if any discrepancies are noted . A summary of recommendations for corrective action , including maintenance and / or replacement of components tested . A summary of recommendations for future inspection and test intervals for all equipment tested . |
Location
Country | United States of America (USA) |
State | Nebraska |
Source
Source | Nebraska Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Power Generation (CCGT) |
Article published date | 2026-04-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Power Generation (CCGT) tenders in United States of America
- RFP - Thurston County Lake Management Districts Submerged Aquatic Vegetation Control
- Coatings for Wet Well and Manholes
- Security Hardware Services
- 23B49SR Marine Science Center Turtle Canopy
- Purchase and Supply of Engine Oil for the McIntosh Reciprocating Engine Project MREP
- Chambers Creek Regional Wastewater Treatment Plant BNR Aeration Basin Airflow Meters
- Se Dixie Highway County Road A1A Utility Relocation Project
- PreQualification of Bidders for Chaboya Improvements
