Deck Repairs
The scope, dates and status of this tender. A free account opens every field.
Source: Arkansas Purchasing Group
The Contractor shall furnish all labor , materials , tools , equipment , supervision , transportation , and incidentals necessary to complete the entire Scope of Work that follows : 1 . Prospective Contractor shall ensure 12 " O . C . max for all joists and stringers . 2 . Prospective contractor shall ensure correct elevation
- Status
- Closed
- Sector
- Metal, Cement, Rail, Hotel
- Location
- Arkansas, United States of America
- Updated
- 3 Nov 2026
- Source
- Arkansas Purchasing Group
ConstructChat
Ask ConstructChat about Deck Repairs
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | The Contractor shall furnish all labor , materials , tools , equipment , supervision , transportation , and incidentals necessary to complete the entire Scope of Work that follows : 1 . Prospective Contractor shall ensure 12 " O . C . max for all joists and stringers . 2 . Prospective contractor shall ensure correct elevation of beams and all joists to be the same height ; replace any rotten or damaged boards in beams , and screw together to make them a solid beam then install bolts at a distance not to exceed 24 " on center diagonally spaced . 3 . Prospective contractor shall correct the elevation of all joists to match the top of wall ledger and top of front beams with elevation of front beams to be corrected to proper height . 4 . Prospective contractor shall add flashing cap to any and all beams containing plywood . 5 . Prospective contractor shall replace all damaged joist hangers and install all joist hangers using Simpson Strong - Tie SDS screws , ( or equivalent ) to proper height to hold joist at proper height before installing new decking . 6 . Prospective contractor shall replace any rotten , damaged , or otherwise compromised joists found after removing existing decking as needed . 7 . Prospective contractor shall after correcting all joists ( 12 " O . C .), and beams heights , to install new 1 " Trex Select ( Equivalent or better ) composite decking with hidden fasteners . 8 . Prospective contractor shall remove existing handrailing and replace with new pressure treated material to match existing handrails to a height of approx . 41 " off of decking to top rail with bottom rail to be approx . 3 " off of decking with spindles to be a max . 4 " on center . Prospective contractor shall replace 2x4 on rock columns with a 2x6 to cover existing caulking . 9 . Prospective Contractor shall ensure hand rail cap to be screwed from underneath ; no screws to penetrate the top , and handrail cap to be free of snags and splinters . 10 . Prospective contractor shall install 5 " x 5 " treated pier posts with a double support beam ( to match existing framing ) centered on any joist header where span is over 12 ’; All beams to be secured to joist with hurricane ties . 11 . All posts shall be seated on a concrete footing a min . of 8 " x 16 " x 16 " using 5 ' x5 ' post brackets . 12 . All joist and stair stringers not to exceed 12 " max on center . 13 . Prospective contractor shall Remove existing steps and install new with pressure treated stringers not to exceed 12 " on center along with new 1 " Trex Select composite decking for treads also with new handrailing . 14 . Prospective contractor shall remove existing metal handrail , refinish to match existing , and reinstall with new lag bolts securely . 15 . Prospective contractor shall construct any and all construction safety barriers to keep bystanders out of work areas and at a safe distance for the duration of the project . 16 . Prospective contractor shall furnish all tools , materials , equipment and labor necessary to complete project . 17 . Prospective contractor shall prevent unnecessary damage to any part of bldg . 18 . Prospective contractor shall ensure , if rock pillars are altered in anyway , they are restored back to original quality and any mortar used shall match existing . 19 . Prospective contractor is responsible for any and all post - project clean - up . 20 . Prospective contractor shall remove all debris ( including nails and medals , all disposable materials offsite ) at the end of each workday . 21 . Prospective contractor shall work during normal business hours . 22 . All work must be scheduled with park officials . 23 . Prospective contractor shall provide all necessary Taxes and Freight . 24 . Prospective contractor shall provide one ( 1 ) year warranty that applies to all work performed . 25 . Prospective contractor shall furnish Workmen ’ s Comp ., General Liability Insurances . 26 . Prospective contractor is responsible for all materials deliveries and protection of during construction . 27 . Prospective contractor is responsible for protection of bldg . from elements during all periods of construction . |
Location
Country | United States of America (USA) |
State | Arkansas |
Source
Source | Arkansas Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Metal, Cement, Rail, Hotel |
Article published date | 2026-03-27 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Metal tenders in United States of America
- Token Creek Roof Replacements
- HVAC Ice Machine Servicing and Sheet Metal Fabrication
- Jail Courthouse Walkway Project
- RFP 887702021MF Rapid Response Fire Boat for Norfolk FireRescue
- Various Locations Sewer Replacement No. 9 [BID TABULATION]
- Millbrae Warehouse Loading Dock Repair
- Biosolids Digester Facilities - Southeast Treatment Plant T-...
- Electrical (C-10 License), San Francisco, San Mateo, Santa C...
