DEEPSTEP ROAD PUMP STATION AND FORCEMAN

Bids closed Aug 2026 · Georgia · Last reported Jul 2026

Tender
Under Evaluation

All Bidders must have a State of Georgia Utility Contractor License and must employ a state ¿Utility Manager¿ certificate holder who will have oversight of all the work. The work to be done consists of furnishing all materials, equipment and labor for the construction of: Division One: Construction of a water line extension including a 100 LF Jack & Bore installation of 8-inch water line, relocati

Status
Closed
Sector
Road, Power Transmission, Power Generation (CCGT), Waste Processing and Treatment
Location
Georgia, United States of America
Updated
3 Nov 2026
Source
Georgia Procurement Registry

ConstructChat

Ask ConstructChat about DEEPSTEP ROAD PUMP STATION AND FORCEMAN

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “DEEPSTEP ROAD PUMP STATION AND FORCEMAN” is a tender record in Taiyo, linked to the Road sector. It is issued for works, goods, or services related to Georgia, United States.

Participants

Not available for this record.

Status

Original status

under evaluation

Taiyo status

Closed

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

All Bidders must have a State of Georgia Utility Contractor License and must employ a state ¿Utility Manager¿ certificate holder who will have oversight of all the work. The work to be done consists of furnishing all materials, equipment and labor for the construction of: Division One: Construction of a water line extension including a 100 LF Jack & Bore installation of 8-inch water line, relocation of one 8-inch water meter in new vault and installation of one 8-inch water meter in a new vault to include gate valves and fire hydrant. Time of completion for Division One is 60 calendar days. Division Two: Construction of a raw sewage pump station site including precast wetwell, submersible pumps, road grading, rocking, fencing, water service and approximately 5,500 L.F. of 6-inch sewer force main and gravity sewer and connection manhole. Time of completion for Division One is 180 calendar days. Proposals for the complete work in one general contract shall be made on the proposal form provided and shall contain prices in words and figures for the work bid on. All proposals shall be accompanied by a Bid Bond drawn in favor of the City of Sandersville, Georgia, in the amount of at least 5% of the lump sum bid for the complete work; such Bid Bond representing that the Bidder, if awarded the contract, will promptly enter into a contract and furnish Performance Bond and Payment Bond as provided by law and approved by the Attorney for the City of Sandersville, Georgia. Each bond shall be equal to 100% of the contract amount. The Bid Bond shall be forfeited to the City of Sandersville, Georgia as liquidated damages if the Bidder fails to execute the contract and provide Performance and Payment Bonds within 10 days after being notified that he has been awarded the contract.

Original sector

Construction / Public Works

Location

Country

United States of America (USA)

State

Georgia

Source

Source

Georgia Procurement Registry

URL

More Details

Record type

Tender

Sector

Road, Power Transmission, Power Generation (CCGT), Waste Processing and Treatment

Article published date

2026-10-22

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender