Defining Period
Sector: Nuclear • Location: United Kingdom
Source: Open Contracting Data Standard (OCDS)
The first call-off contract serves as a bridge between the Concept Design and Preliminary Design phases. It will require the appointed Strategic Design Partner to work in collaboration with UKNNL to integrate into the delivery team to develop a scope for the Preliminary Design phase that underpins the objectives of the overall programme.
- Status
- Closed
- Sector
- Nuclear, Bridge
- Location
- United Kingdom
- Updated
- 3 Nov 2026
- Source
- Open Contracting Data Standard (OCDS)
ConstructChat
Ask ConstructChat about Defining Period
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | complete |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | The first call-off contract serves as a bridge between the Concept Design and Preliminary Design phases. It will require the appointed Strategic Design Partner to work in collaboration with UKNNL to integrate into the delivery team to develop a scope for the Preliminary Design phase that underpins the objectives of the overall programme. |
Location
Country | United Kingdom (UK) |
Source
Source | Open Contracting Data Standard (OCDS) |
URL |
More Details
Record type | Tender |
Sector | Nuclear, Bridge |
Article published date | 2026-04-02 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Nuclear tenders in United Kingdom
- Diagnostic and Capital Equipment and Related Accessories and Services
- Purchase of electronics pod
- HPB - Provision of Radioactive Waste Management Services (AGR Unique Ref. 34 F/W)
- University Interactions - NDA Research Portfolio - Single Supplier Framework
- Manufacturability Assessment of the PEGASUS Transport Package Design
- Collection of Chemical Waste and Paints (Hazardous and Non-Hazardous)
- Manufacture, Supply & Installation of Pipework System
- Manufacture, Supply & Installation of Pipework System
