Demolition & Structural Alterations
One of 10,000+ tenders Taiyo tracks in United Kingdom.
Source: Find a Tender Service (UK)
All structural interventions, modifications and demolition as detailed in Price & Myers, Witherford Watson Mann and Purcell design drawings; Demolition of Strand floor, facade, and other elements as specified by the design engineers; Survey and investigation works required to ensure design and methodology is completed in time within the restraints of the existing structure; Localised noise, dust a
- Status
- Closed
- Sector
- Forest Products and Packaging, Steel, Cement, Metal
- Location
- United Kingdom
- Updated
- 3 Nov 2026
- Source
- Find a Tender Service (UK)
ConstructChat
Ask ConstructChat about Demolition & Structural Alterations
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | complete |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | All structural interventions, modifications and demolition as detailed in Price & Myers, Witherford Watson Mann and Purcell design drawings; Demolition of Strand floor, facade, and other elements as specified by the design engineers; Survey and investigation works required to ensure design and methodology is completed in time within the restraints of the existing structure; Localised noise, dust and vibration monitoring; Clean and re-use of existing brickwork for new wall installs; Formation of new floors including padstones or steel bearing plates, steels, joisting and sheathing; Formation and infills to all pockets formed for new structure install, both for this package and other (i.e. Structural Steelwork), including padstones and steel bearing plates; All mass poured, pre-cast, or reinforced concrete works including the new stair core, stairs, underpinning, pads, ramps, slabs and upstands; All dry packing, grouting, and encasement to steel members, including those installed by Others; Attendance and return visits required for the above installs by Others; External Luxcrete repairs; CCTV and repairs of existing below ground drainage. CCTV of new drainage; Install of items free issued by others (e.g. cast-in plates by Structural Steelwork contractor); Where shown in package split, all new primary and secondary steelwork, connections, metal deck, intumescent coating, padstones, steel bearing plates and dry packing; Alterations to existing structure including formation of new risers and services penetrations, box frames and trimmer steels and timbers; 3rd party review and confirmation of any intumescent and fire stopping installs; Forming of all new lift pits including underpinning, reinforcement and waterproof concrete; Installation of all waterproofing, blinding, insulation and sump (including commissioning) requirements; Facade and party wall retention propping to facilitate demolition Works; Demolition of existing stairwell in the East Wing including all associated temporary works, and infill of new landing; All blockwork and brick walls as shown in package split including windposts; Form new openings including lintels, beams, posts; Re-levelling of existing floor substrates; Removal and excavation of existing screed and slabs, including localised repaires where required; Covering or edge protection install to all voids and openings formed by the Works; Installation of riser flooring systems to all newly formed and existing riser opening; Strengthening of existing beams, including services opening coordination and formation; Removal or containment of any asbestos (e.g. Strand buildings timber flooring), lead, guano and anthrax where required to complete the Works, with appropriate measures in place; Removal, protection and off-site storage of heritage items such as stone beams and flags, grilles, fireplaces and hearths; Removal of existing heritage windows following surveys by Others; Installation of tower crane base including piles and cap; Fire and corrosion protection to steel in-situ application (new only); Temporary & permanent steel bracing; Protection of all existing heritage finishes (where at risk of damage from the works); All scaffolding and crash decks to facilitate the works (e.g. Strand south facade elevation); Propping of existing vaults at Strand; Underslab drainage works and GRP sumps; Surveys of existing structure, looking ahead on programme to avoid last minute discoverables; Install of gulleys, manhole covers and associated below-ground drainage components; |
Location
Country | United Kingdom (UK) |
Source
Source | Find a Tender Service (UK) |
URL |
More Details
Record type | Tender |
Sector | Forest Products and Packaging, Steel, Cement, Metal |
Article published date | 2026-09-24 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Forest Products and Packaging tenders in United Kingdom
- Remedial Repair Works to Eastern Boundary Wall at St Mary's Closed Churchyard, Henley
- Biogenic Stored Carbon Quotient (BSCQ) Standard
- 175 27 Catering Disposables
- Secure Collection, Destruction and Disposal of Confidential Waste. (Paper Shredding)
- Replacement floors and associated works at 21 and 23 Lonsdale Ave, WSM (717-AHL)
- Assessing the wider value of agri-environment scheme heritage actions for the natural environment and for people
- Assessing the wider value of agri-environment scheme heritage actions for the natural environment and for people
- Internal Cleaning Contract for Broadstairs & St Peter's Town Council
