Depot Fire Hydrants Design and Build - Tranche 1
Sector: Water Supply and Storage • Location: United Kingdom
Source: Find a Tender Service (UK)
This Contract Award Notice is issued in accordance with the Procurement Act 2023 to notify the market of the intention to award a contract and to formally commence the standstill period for Design and Build of Depot Fire Hydrants at 2 locations (Queens Park and Triangle Sidings) The currently installed hydrant systems at certain depots do not meet current regulations and British Standards (BS) due
- Status
- Closed
- Sector
- Water Supply and Storage
- Location
- United Kingdom
- Updated
- 3 Nov 2026
- Source
- Find a Tender Service (UK)
ConstructChat
Ask ConstructChat about Depot Fire Hydrants Design and Build - Tranche 1
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | complete |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | This Contract Award Notice is issued in accordance with the Procurement Act 2023 to notify the market of the intention to award a contract and to formally commence the standstill period for Design and Build of Depot Fire Hydrants at 2 locations (Queens Park and Triangle Sidings) The currently installed hydrant systems at certain depots do not meet current regulations and British Standards (BS) due to the age of the systems, so an upgrade is required as the readings at the locations tested were below the levels stipulated in BS and TfL standards. In case of a fire, the system is unable to supply water at the required pressure and flow rate to extinguish fires. The requirement of the procurement is to appoint a contractor to undertake works to ensure that fire hydrant systems at the 2 locations are fully operable, in good working condition and in full compliance with relevant safety legislations associated with the hydrant system - BS and TFL standards In line with the Procurement Act 2023, this Contract Award Notice triggers an 8 working day standstill period, as applied automatically by the Find a Tender system. The Authority will not enter into the contract before the end of this standstill period. The proposed contract is awarded to Delcore Fire Engineering Ltd in accordance with Procurement Act 2023 |
Location
Country | United Kingdom (UK) |
Source
Source | Find a Tender Service (UK) |
URL |
More Details
Record type | Tender |
Sector | Water Supply and Storage |
Article published date | 2026-09-21 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Water Supply and Storage tenders in United Kingdom
- District Heating Network Performance, Operational Monitoring and Planned Maintenance Services
- Swiftwater and Flood Boat Rescue Operator Training
- Sewer Mapping
- Technology Services Partner Framework (TSPF)
- Technology Services Partner Framework (TSPF)
- Provision and installation of burial vaults
- Diagnostic and Capital Equipment and Related Accessories and Services
- Wheal Jane - Reaction Chamber Mixing Tanks VSDs
