logo

Desc2103C - Bulk Fuel Storage Tanks Phase Ii, Yokota Air Base, Japan

Solicitation · Yokota Air Base, Japan

Source: SAM.gov

Tender
Solicitation

Update 19 October 2026: Updated RFI Response Report has been posted to PIEE. Update 25 September 2026: Preliminary RFI Response Report has been posted to PIEE. Update 14 September 2026: Attached Site Visit Roster. Update 10 September 2026: Attached Pre-Proposal Conference Slides. Project Title: DESC2103C - Bulk Fuel Storage Tanks Phase II. Project Description: Construct one 100,000-barrel cut-and-

Status
Prospective
Sector
Residential, Wind, Oil and Gas, Cement, Steel, Aerospace & Defense, Commercial, Water Supply and Storage
Location
Japan
Updated
3 Nov 2026
Source
SAM.gov

ConstructChat

Ask ConstructChat about Desc2103C - Bulk Fuel Storage Tanks Phase Ii, Yokota Air Base, Japan

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “Desc2103C - Bulk Fuel Storage Tanks Phase Ii, Yokota Air Base, Japan” is a tender record in Taiyo, linked to the Residential sector. It is issued for works, goods, or services related to Yokota Air Base, Japan.

Participants

Not available for this record.

Status

Original status

solicitation

Taiyo status

Prospective

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

Update 19 October 2026: Updated RFI Response Report has been posted to PIEE. Update 25 September 2026: Preliminary RFI Response Report has been posted to PIEE. Update 14 September 2026: Attached Site Visit Roster. Update 10 September 2026: Attached Pre-Proposal Conference Slides. Project Title: DESC2103C - Bulk Fuel Storage Tanks Phase II. Project Description: Construct one 100,000-barrel cut-and-cover JP-8 storage tank. A pump house is to be provided on the top of the tank and contain four 600-gpm issue vertical turbine pumps and one 50-gpm water draw off vertical turbine pump. The new tank will include a high-level valve, independent level alarms, and the hardware necessary for the automatic tank gauging (ATG) system. The new tank includes piping, valves, vaults and appurtenances connecting to an existing filter separator building. The new control system of the new tank will be connected to the existing filter building that houses pump control Programmable Logic Controller (PLC) and Human Machine Interface (HMI), automatic tank gauge (ATG) reporting module capable of reporting inputs from all Eastside Fuel Facility tanks. A product saver tank is to be provided for the new bulk storage tank. The Pump House will be of reinforced concrete construction and site adapted to meet local conditions. The roof will be a low slope concrete roof with built-up roofing with overhangs over doorways. The tank is to be steel with concrete outer wall with a rolling cover for access to tank mounted equipment. The product recovery pump will return reclaimed fuel back through receipt filtration to the bulk storage tanks.

Original sector

Construction

Location

Country

Japan

Source

Source

SAM.gov

URL

More Details

Record type

Tender

Sector

Residential, Wind, Oil and Gas, Cement, Steel, Aerospace & Defense, Commercial, Water Supply and Storage

Article published date

2026-10-20

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender