logo

Design - Build Renovation – Vacant Office Suite + Two ADA Restroom Upgrades at City Hall

The scope, dates and status of this tender. A free account opens every field.

Source: Missouri Purchasing Group

Tender
Closed

The Design - Build Contractor will provide all labor , materials , equipment , supervision , design , engineering , permitting support , and construction services necessary for a complete , code - compliant project . 5 . 1 General Requirements • Conduct field verification of existing conditions • Prepare design documents sufficient for

Status
Closed
Sector
Government, Power Generation (CCGT), Commercial, Residential
Location
Missouri, United States of America
Updated
3 Nov 2026
Source
Missouri Purchasing Group

ConstructChat

Ask ConstructChat about Design - Build Renovation – Vacant Office Suite + Two ADA Restroom Upgrades at City Hall

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “Design - Build Renovation – Vacant Office Suite + Two ADA Restroom Upgrades at City Hall” is a tender record in Taiyo, linked to the Government sector. It is issued for works, goods, or services related to Missouri, United States of America.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

The Design - Build Contractor will provide all labor , materials , equipment , supervision , design , engineering , permitting support , and construction services necessary for a complete , code - compliant project . 5 . 1 General Requirements • Conduct field verification of existing conditions • Prepare design documents sufficient for permitting and construction • Coordinate required disciplines ( architecture ; structural as needed ; MEP ; plumbing ; fire / life safety ; accessibility ; etc .) • Secure / assist with permitting and inspections as required by jurisdiction ( final responsibilities to be defined in contract ) • Provide all materials , construction , any applicable testing , closeout documentation , training ( if needed ), warranties , and as - builts 5 . 2 Vacant Office Area Renovation Work may include : • Demolition and removal of existing non - structural elements as required • Construction of the following , including all materials : o Interior partitions / doors / hardware modifications or replacement o Ceilings , lighting , power / data coordination , and HVAC / plumbing adjustments o Flooring and wall finishes o Casework or built - ins ( if shown / needed ) o Fire / life safety compliance ( egress , signage , fire ratings , alarms / sprinklers coordination ) 5 . 3 Two Restroom Renovations – ADA Compliance Work shall deliver restrooms that meet applicable accessibility standards , which may include : • Demolition and removal of existing non - structural elements and as required • Accessible clearances , turning spaces , door maneuvering clearances • Accessible toilet stall ( s ), grab bars , flush controls , dispensers , mirrors , lavatory height / knee clearance , faucet controls • Door and hardware replacement ( lever handles ), closers as needed • Plumbing modifications ( supply / waste / vent ), fixtures , shutoffs • Ventilation improvements where needed • Durable wall / floor finishes appropriate for public restrooms • Accessories relocation / replacement to meet reach ranges • Lighting and electrical modifications as required 5 . 4 Phasing and Occupied Facility Constraints City Hall will remain occupied during construction . The Design - Build Team shall : • Provide a phasing plan to minimize disruption • Maintain safe public access and staff operations • Implement dust / noise control and housekeeping • Provide daily site safety controls and secure work areas

Location

Country

United States of America (USA)

State

Missouri

Source

Source

Missouri Purchasing Group

URL

More Details

Record type

Tender

Sector

Government, Power Generation (CCGT), Commercial, Residential

Article published date

2026-04-29

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender