Design / Build Services for UNH Gables North & South ‐ Boiler Replacement

One of 2,790 tenders Taiyo tracks in New Hampshire.

Source: New Hampshire Purchasing Group

Tender
Closed

USNH , representing UNH Facilities Project Management , is seeking qualified firms to provide design / build services for Gables North & South Boiler Replacement . Scope of Work UNH 2024 - 0005 — Gables North & South Boiler Replacement Project January 29 , 2026 This project includes the complete removal and replacement

Status
Closed
Sector
Water Supply and Storage, Manufacturing (Industrial), Metal, Natural Gas, Education, Commercial, Cement
Location
New Hampshire, United States of America
Updated
3 Nov 2026
Source
New Hampshire Purchasing Group

ConstructChat

Ask ConstructChat about Design / Build Services for UNH Gables North & South ‐ Boiler Replacement

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “Design / Build Services for UNH Gables North & South ‐ Boiler Replacement” is a tender record in Taiyo, linked to the Water Supply and Storage sector. It is issued for works, goods, or services related to New Hampshire, United States of America.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

USNH , representing UNH Facilities Project Management , is seeking qualified firms to provide design / build services for Gables North & South Boiler Replacement . Scope of Work UNH 2024 - 0005 — Gables North & South Boiler Replacement Project January 29 , 2026 This project includes the complete removal and replacement of the existing Lochinvar Copper - Fin II hot water boilers and related systems in both the Gables North and Gables South buildings . The following scope is written for one building and shall be applied equally to both . 1 . Pre - Removal System Cleaning • Prior to removing or disconnecting any components , flush the existing hydronic system using BoilerMag BM3 or an approved equal . • Add 1 pint of cleaner per 25 gallons of system capacity . • Circulate cleaner through the system for a minimum of 1 hour and a maximum of 7 days . • Use indicator test strips to verify proper cleaner concentration . • Flush the system until water runs clear , then perform a second test to confirm that the system is fully cleaned . 2 . Boiler and Pump Replacement • Remove the existing boilers , pumps , breeching , and associated components . • Install two ( 2 ) Lochinvar FTX850 condensing boilers or approved equal . • Modify the existing concrete housekeeping pads as required to fit new units . • Install new Bell & Gossett Ecocirc XL20 - 140 boiler pumps or approved equal . • Provide all required accessories including : o Shut - off valves o Thermometers o Pipe insulation o Hangers and supports o Pipe labeling 3 . Combustion Air and Venting • Install new combustion air and exhaust venting in accordance with : o Manufacturer requirements o Local code requirements • Terminate venting at an existing boiler room louver . • If penetration of the louver is required : o Provide a properly sized sleeve o Seal watertight o Install manufacturer - recommended weather caps o Modify the interior of the louver as needed • Coordinate exact louver location with the Owner . • Cap existing breeching to maintain operation of domestic water heaters . 4 . Condensate System • Install the manufacturer - recommended condensate filtration system . • Pipe boiler condensate to existing floor drains . • Provide one ( 1 ) spare condensate filter for Owner use . 5 . Boiler Piping Modifications • Modify existing boiler piping to add a full - size common pipe connecting to the existing system , establishing a primary - secondary hydraulic arrangement . • Remove existing mixing valves and associated controls . • Replace removed valves with full - size insulated piping . 6 . Natural Gas Piping • Extend existing natural gas piping to serve the new boilers . • Provide : o Plug valves o Strainers o Gas regulators 7 . Controls • Modify the existing controls system to support : o New boilers o New boiler pumps o Elimination of mixing valves • Review and confirm revised sequence of operations with the Owner . 8 . Electrical • Extend existing electrical circuits to new equipment . • Provide new local disconnect switches as required . 9 . Commissioning • Provide factory start - up services for the new boilers .

Location

Country

United States of America (USA)

State

New Hampshire

Source

Source

New Hampshire Purchasing Group

URL

More Details

Record type

Tender

Sector

Water Supply and Storage, Manufacturing (Industrial), Metal, Natural Gas, Education, Commercial, Cement

Article published date

2026-04-28

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender