Design / Build Services
Closed · MITN · Last reported Dec 2025
Source: MITN Purchasing Group
PROJECT OVERVIEW AND GOAL The DIA is requesting bids to provide Design / Build construction services . The goal of this project is to address the shortage of two classroom spaces ( one being an art classroom ), including additional areas such as support facilities and conference rooms , and : To evaluate avai
- Status
- Closed
- Sector
- Steel, Commercial, Power Transmission, Power Generation (CCGT)
- Location
- MITN, United States of America
- Updated
- 3 Nov 2026
- Source
- MITN Purchasing Group
ConstructChat
Ask ConstructChat about Design / Build Services
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | PROJECT OVERVIEW AND GOAL The DIA is requesting bids to provide Design / Build construction services . The goal of this project is to address the shortage of two classroom spaces ( one being an art classroom ), including additional areas such as support facilities and conference rooms , and : To evaluate available spaces and provide the best design allowing the school to maximize space and uses . To design spaces that are in harmony with access , circulation , and appearance to the existing school . To make the most efficient use of the property and building areas available . To address all site , utility and school spaces that are impacted by the renovation or are deemed best to include in the process . To conclude with realistic conceptual plans and conceptual cost estimates to construct and build the identified school spaces . To keep School Leadership and the Board ’ s Classroom Renovation Committee apprised weekly of all matters until the space is occupied . PROJECT SCOPE AND SPECIFICATIONS Below are the listed considerations for the two classrooms within existing school / available church spaces . Alternate options for considerations are welcomed . Art Classroom Considerations : o Art classroom to accommodate up to 30 students with tables o Utility sink - ideally thermoplastic or stainless steel with additional counter top space o Base / wall cabinets with drawer base o Rectangle LED Flush lighting for ceiling o Wall / ceiling mounted projector o Magnetic marker white board o Electrical outlets for equipment including outlets on the wall o 400w Outlet for possible kiln |
Location
Country | United States of America (USA) |
State | MITN |
Source
Source | MITN Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Steel, Commercial, Power Transmission, Power Generation (CCGT) |
Article published date | 2026-05-14 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
