Design / Engineering and Construction Services for MERP Projects
Sector: Solar • Location: Vermont, United States of America
Source: Vermont Purchasing Group
The selected Bidder shall provide all labor , materials and equipment to perform the following tasks . 1 . HVAC : Replace the existing oil boilers with heat pumps as recommended by engineering design and / or the installer . 2 . Envelope : a . Air Sealing b . The addition of insulation , as recommended by the engin
- Status
- Closed
- Sector
- Solar, Cement, Energy Storage, Oil and Gas, Electric Vehicles (EVs), Commercial, Automotive
- Location
- Vermont, United States of America
- Updated
- 3 Nov 2026
- Source
- Vermont Purchasing Group
ConstructChat
Ask ConstructChat about Design / Engineering and Construction Services for MERP Projects
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | The selected Bidder shall provide all labor , materials and equipment to perform the following tasks . 1 . HVAC : Replace the existing oil boilers with heat pumps as recommended by engineering design and / or the installer . 2 . Envelope : a . Air Sealing b . The addition of insulation , as recommended by the engineering design and / or the installer . 3 . Lighting : LEDs 4 . ADA improvements will be made to address issues with building entry , movement within the building , bathrooms , and improved access to all public locations . * Only 20 % of construction costs can be expended on ADA upgrades . 5 . Soft costs will be used to pay for permits ( as required ), architectural / engineering design , project management , and clerking . * Only 20 % of construction costs can be expended on soft costs . 6 . EV Chargers 7 . Solar Panels 8 . Other : Battery Storage This project will require demolition of existing worn , damaged , or degraded materials within the structure ' s interior , such as drywall , batt insulation , and portions of the roof membrane . All structural elements , roof decking , concrete pads , and / or foundational construction shall remain in place and be repaired as required to implement the energy conservation measures outlined above . The Scope of Work may be altered , if necessary , to address budgetary , design , and / or feasibility needs for these projects . Project design should include as many of the project elements listed above and should reflect the MERP project element prioritization hierarchy included in Act 172 – 1 ) Building Envelope ; 2 ) Fuel Switching and HVAC Systems ; 3 ) Lighting and Mechanicals , 4 ) Ventilation ( ERV or HRV and ductwork ); 5 ) Resilience Measures ( EV Chargers , solar panels , and battery storage ). Proposals must include line items to ensure ADA accessibility on the building ' s first floor . |
Location
Country | United States of America (USA) |
State | Vermont |
Source
Source | Vermont Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Solar, Cement, Energy Storage, Oil and Gas, Electric Vehicles (EVs), Commercial, Automotive |
Article published date | 2026-04-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Solar tenders in United States of America
- Software For Renewable Energy Storage Monitoring Services
- Sunol Valley Water Treatment Plant Ozonation
- Sunol Long Term Improvements - Alameda Creek Watershed Cente...
- CANCELLED - Alameda Creek Recapture
- Design-Build Services for San Joaquin Valley Communication S...
- General Building (B License) Construction, San Francisco, Sa...
- Request for Proposals for Scope III, Bid Solicitation 3, Sou...
- City Distribution Division Campus at 2000 Marin [Minimum Qua...
