Design and Construction of Infrastructure & Superstructure Works including Electrification under the İstanbul North Rail Crossing Project (INRAIL)
On going · Luxembourg
Source: European Investment Bank (EIB)
The Ministry of Transport and Infrastructure, Directorate General of Infrastructure Investments, Türkiye (hereinafter - teh Ministry), has received financing from the World Bank through Ministry of Treasury and Finance towards the cost of the INRAIL Project. The Project is being jointly financed by the Asian Infrastructure Investment Bank, the Asian Development Bank, the European Bank for Reconstr
- Status
- Prospective
- Sector
- Bridge, Rail, Airport, Tunnel, Telecommunications, Mass Transit
- Location
- Luxembourg
- Updated
- 3 Nov 2026
- Source
- European Investment Bank (EIB)
ConstructChat
Ask ConstructChat about Design and Construction of Infrastructure & Superstructure Works including Electrification under the İstanbul North Rail Crossing Project (INRAIL)
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | on going |
Taiyo status | Prospective |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | The Ministry of Transport and Infrastructure, Directorate General of Infrastructure Investments, Türkiye (hereinafter - teh Ministry), has received financing from the World Bank through Ministry of Treasury and Finance towards the cost of the INRAIL Project. The Project is being jointly financed by the Asian Infrastructure Investment Bank, the Asian Development Bank, the European Bank for Reconstruction and Development, the Islamic Development Bank, and the OPEC Fund for International Development. The Project will finance the construction of a 127 km greenfield railway line designed to bypass the Istanbul Metropolitan Area and establish a high-capacity overland link across the Istanbul Strait (Bosphorus). The line will be double-tracked, electrified, fully signalized, and mixed-use, capable of carrying both passengers and freight, with a maximum freight carrying capacity of 50 million tons per year. The proposed railway line will originate at Çayrova station on the Asian side and terminate at Çatalca station on the European side, crossing the Istanbul Strait by utilizing the existing track space allocated on the Yavuz Sultan Selim Bridge (YSS Bridge), also known as the Third Bosphorus Bridge, located at the northern end of the Istanbul Strait. The Ministry intends to apply a portion of the loan proceeds toward payments under the contract(s) for the "Design and Construction of Infrastructure and Superstructure Works, including Electrification" subdivided into four Lots as listed below. The scope of works covered under this procurement package as a whole (all four lots together) encompasses the design and construction including electrification of 122.3 km of double-track main line and 4.7 km of single-track connection lines, 5 twin-tube Tunnel Boring Machine (TBM) tunnels totaling 36.2 km, 22 double-track New Austrian Tunneling Method (NATM) tunnels totaling 23.3 km, 17 cut-and-cover tunnels totaling 3.7 km, two viaducts and 40 bridges totaling 22.1 km, Stations, etc. The scope of works covered under each lot is specified in the RFP document. The Telecommunication and Signalling Works are not included in this procurement package and will tendered separately. The Ministry now invites sealed Proposals from eligible Proposers for the Design and Construction of Infrastructure & Superstructure Works including Electrification subdivided into the four lots below. Proposers may submit Proposal for one or more lot(s): Lot 1 — Construction and Electrification Works for the Çayrova – Sabiha Gökçen Airport – Kurtdomu Corridor (28,49 km); Lot 2 — Construction and Electrification Works for the Kurtdomu – Alibahadr Corridor (25,76 km); Lot 3 — Construction and Electrification Works for the Alibahadr – YSS Bridge – Mithatpaa Corridor (32,14 km); Lot 4 — Construction and Electrification Works for the Mithatpaa – stanbul Airport – Çatalca Corridor (39,49 km). |
Location
Country | Luxembourg |
Source
Source | European Investment Bank (EIB) |
URL |
More Details
Record type | Tender |
Sector | Bridge, Rail, Airport, Tunnel, Telecommunications, Mass Transit |
Article published date | 2026-08-23 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Bridge tenders in Luxembourg
- Réalisation d’un passage à faune mixte en remplacement de l’OA1009 sur l’A6
- Appel d'offres portant sur le déploiement national de plaquettes physiques d'information aux arrêts d'autobus
- Mise à 2x2 voies de la B7 entre le Viaduc Colmar-Berg et Ettelbruck – Lot 1 OA 1502 : Doublement du Viaduc de Schieren
- Gare de Luxembourg, remaniement caténaires de la partie tête-ouest - phase candidature
- CONTRAT CADRE : Amélioration de la couverture en réseaux mobiles le long des voies : Réalisation de plans de principe et demandes administratives pour construction de mâts de Télécommunication - Phase candidatures
- CORRIGENDUM FOR EXTENSION OF DEADLINE FOR SUBMISSION - CONSULTANCY SERVICES FOR THE SUPERVISION OF CONSTRUCTION WORKS FOR RUSTAVI-ALGETI (LOT I) AND ALGETI-RED BRIDGE (LOT II)
- Lao Resilient Roads Framework Loan – National Road No. 13 South Project
- India-Nagpur- Design, Supply, Installation, Testing and Commissioning of Ballastless track for elevated viaduct of Reach 1B & Reach 3A of NMRP Phase-2