Design and Permitting Consultant for Great River Park Improvement Project
The scope, dates and status of this tender. A free account opens every field.
Source: Connecticut Purchasing Group
Great River Park is located on the Connecticut River in East Hartford , CT , covers approximately 21 acres and has 1 . 3 miles of shoreline stretching between Charter Oak and Bulkeley Bridges . It was constructed in three phases between 1985 and 1996 and features a lighted riverwalk , amphitheater , boat ramp
- Status
- Closed
- Sector
- Bridge, Car parking, Automotive, Education, Government
- Location
- Connecticut, United States of America
- Updated
- 3 Nov 2026
- Source
- Connecticut Purchasing Group
ConstructChat
Ask ConstructChat about Design and Permitting Consultant for Great River Park Improvement Project
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | Great River Park is located on the Connecticut River in East Hartford , CT , covers approximately 21 acres and has 1 . 3 miles of shoreline stretching between Charter Oak and Bulkeley Bridges . It was constructed in three phases between 1985 and 1996 and features a lighted riverwalk , amphitheater , boat ramp , scenic overlooks , picnic tables and multiple pieces of public art . The project area starts at the existing amphitheater , extends south to the Charter Oak Bridge , and will connect to the American Eagle Financial Credit Union ( AEFCU ), Capitol Region Education Council Magnet Middle ( CREC ) school and Simon Konover Company ( Konover ) proposed multi - family housing project properties covering approximately 13 acres . Within the 13 acres there is an existing easement granted by the Konover Corporation to the Town for construction of the third phase of Great River Park Konover Corporation has indicated that they will extinguish the easement and give the land to the Town as part of the overall project . No additional rights - of - way are anticipated for the project . The main goals for the design and permitting phase are : • Develop plans to reinforce and repair the riverbank where trees have been lost to erosion and protection of threatened mature trees that currently stabilize the riverbank . • Develop plans to repair and widen the Riverwalk to current multi - modal use standards , raise a section of riverwalk to increase its use and reduce maintenance costs , relocate trailside amenities such an benches and trash receptacles to areas less impact by flooding , and for the repair / replacement of underground lighting circuits impacted by decades of flood inundation . • Plan for aesthetic improvements to a vehicular bridge over the Hockanum River used by walkers , cyclists , and emergency vehicles . • Plan for ADA accessible parking at the northern end of the trail |
Location
Country | United States of America (USA) |
State | Connecticut |
Source
Source | Connecticut Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Bridge, Car parking, Automotive, Education, Government |
Article published date | 2026-03-27 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Bridge tenders in United States of America
- FY2023 Patch Truck
- 20222023 Bridge Preventive Maintenance Program
- Small Bridge Design Services Various Locations throughout Ocean County
- Pipeline Trail Phase 1 Project
- Construction Engineering Inspection Services for FDOT LAP Bridge Projects
- Miccosukee Road Bridge Replacement
- Bridge Design Services 3 Bridges on CTH BB CTH N and CTH TT
- Emergency Repairs to HHW & Power Facilities Following the Ma...
