logo

Design and Permitting Consultant for Great River Park Improvement Project

The scope, dates and status of this tender. A free account opens every field.

Source: Connecticut Purchasing Group

Tender
Closed

Great River Park is located on the Connecticut River in East Hartford , CT , covers approximately 21 acres and has 1 . 3 miles of shoreline stretching between Charter Oak and Bulkeley Bridges . It was constructed in three phases between 1985 and 1996 and features a lighted riverwalk , amphitheater , boat ramp

Status
Closed
Sector
Bridge, Car parking, Automotive, Education, Government
Location
Connecticut, United States of America
Updated
3 Nov 2026
Source
Connecticut Purchasing Group

ConstructChat

Ask ConstructChat about Design and Permitting Consultant for Great River Park Improvement Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “Design and Permitting Consultant for Great River Park Improvement Project” is a tender record in Taiyo, linked to the Bridge sector. It is issued for works, goods, or services related to Connecticut, United States of America.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

Great River Park is located on the Connecticut River in East Hartford , CT , covers approximately 21 acres and has 1 . 3 miles of shoreline stretching between Charter Oak and Bulkeley Bridges . It was constructed in three phases between 1985 and 1996 and features a lighted riverwalk , amphitheater , boat ramp , scenic overlooks , picnic tables and multiple pieces of public art . The project area starts at the existing amphitheater , extends south to the Charter Oak Bridge , and will connect to the American Eagle Financial Credit Union ( AEFCU ), Capitol Region Education Council Magnet Middle ( CREC ) school and Simon Konover Company ( Konover ) proposed multi - family housing project properties covering approximately 13 acres . Within the 13 acres there is an existing easement granted by the Konover Corporation to the Town for construction of the third phase of Great River Park Konover Corporation has indicated that they will extinguish the easement and give the land to the Town as part of the overall project . No additional rights - of - way are anticipated for the project . The main goals for the design and permitting phase are : • Develop plans to reinforce and repair the riverbank where trees have been lost to erosion and protection of threatened mature trees that currently stabilize the riverbank . • Develop plans to repair and widen the Riverwalk to current multi - modal use standards , raise a section of riverwalk to increase its use and reduce maintenance costs , relocate trailside amenities such an benches and trash receptacles to areas less impact by flooding , and for the repair / replacement of underground lighting circuits impacted by decades of flood inundation . • Plan for aesthetic improvements to a vehicular bridge over the Hockanum River used by walkers , cyclists , and emergency vehicles . • Plan for ADA accessible parking at the northern end of the trail

Location

Country

United States of America (USA)

State

Connecticut

Source

Source

Connecticut Purchasing Group

URL

More Details

Record type

Tender

Sector

Bridge, Car parking, Automotive, Education, Government

Article published date

2026-03-27

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender