Design Build and Operate (DBO) of the Wadi Zarqa Wastewater Treatment Plant Phase 1
Sector: Water Supply and Storage • Location: Zarqa & Mafraq Governorates, Jordan
Source: TED Europa
Wadi Zarqa WWTP, based on current flow projections, is planned to be implemented in two phases: Phase 1 aims to achieve a wastewater treatment of 150,000 m3/day by 2030. Phase 2 is planned to add additional capacity of 200,000 m3/day to Phase 1, achieving a total project capacity of 350,000 m3/day by 2034-2035. The project scope, is for the Design, Build and Operate of the Phase 1 of Wadi Zarqa Wa
- Status
- Closed
- Sector
- Water Supply and Storage, Hotel, Hydro
- Location
- Zarqa & Mafraq Governorates, Jordan
- Updated
- 3 Nov 2026
- Source
- TED Europa
ConstructChat
Ask ConstructChat about Design Build and Operate (DBO) of the Wadi Zarqa Wastewater Treatment Plant Phase 1
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | contract notice |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | Wadi Zarqa WWTP, based on current flow projections, is planned to be implemented in two phases: Phase 1 aims to achieve a wastewater treatment of 150,000 m3/day by 2030. Phase 2 is planned to add additional capacity of 200,000 m3/day to Phase 1, achieving a total project capacity of 350,000 m3/day by 2034-2035. The project scope, is for the Design, Build and Operate of the Phase 1 of Wadi Zarqa Wastewater Treatment Plant (WWTP) and associated facilities. The project scope includes but is not limited to the design, permitting, supply, delivery, construction, commissioning, operation, maintenance and transfer of the Wadi Zarqa WWTP, with a Phase 1 treatment capacity of 150,000 m3/d, an approximately 1.4 MW hydropower plant, the conveyance system from the West Zarqa Pump Station (WZPS) to Wadi Zarqa WWTP including 12 km of pipeline with a diameter to be confirmed (estimated at up to 1,600 mm), as well as the expansion of the pre-treatment facility at WZPS. |
Original sector | Construction work |
Location
Country | Jordan |
City | Zarqa & Mafraq Governorates |
Source
Source | TED Europa |
URL |
More Details
Record type | Tender |
Sector | Water Supply and Storage, Hotel, Hydro |
Article published date | 2025-12-05 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Water Supply and Storage tenders in Jordan
- 10021232 - Supporting the Financial Institutions Green Transition
- Consulting Services for Project Implementation Support during the Implementation Phase of the Pipe Conveyor from Telal Al-Thahab to the downstream location on King Abdallah Canal, at Turnout 95
- Contract Administration and Construction Supervision of the Pipe Conveyor from Telal Al-Thahab to the downstream location on King Abdallah Canal, at Turnout 95
- WEST IRBID WASTEWATER NETWORK PROJECT
- Jordan Water Sector Efficiency Project: Consultant services of supervision for Restructuring and enhancement of the Water distribution network in Hizam area and north area/salt
- Construction of Sewer Networks, Pumping Stations and Force Mains for Selected Karak Areas - Package 1
- UNICEF Request for Proposal for Services LRPS 2026- 9203208- Establishment of a long-term agreement for the provision services - Rehabilitation/Upgrade of WASH facilities in Vulnerable Households
- Design for Water-energy-food-ecosystem
