Design Engineering Services for Reconstruction

Sector: Road • Location: Kansas, United States of America

Source: Kansas Purchasing Group

Tender
Closed

Project 1 - 22nd Street from Vine Street to Canterbury Drive is a 35 ’ wide 2 - lane major collector street that carries approximately 6 , 000 vehicles per day . This street segment is approximately 60 years old and is a main thoroughfare for residents living in the area and to nearby businesses and Hay

Status
Closed
Sector
Road, Hospital, Cement, Automotive, Car parking
Location
Kansas, United States of America
Updated
3 Nov 2026
Source
Kansas Purchasing Group

ConstructChat

Ask ConstructChat about Design Engineering Services for Reconstruction

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “Design Engineering Services for Reconstruction” is a tender record in Taiyo, linked to the Road sector. It is issued for works, goods, or services related to Kansas, United States of America.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

Project 1 - 22nd Street from Vine Street to Canterbury Drive is a 35 ’ wide 2 - lane major collector street that carries approximately 6 , 000 vehicles per day . This street segment is approximately 60 years old and is a main thoroughfare for residents living in the area and to nearby businesses and Hays Medical Center . The centerline length of the street to be reconstructed is approximately 5 , 100 LF . Current pavement is a combination of full depth asphalt from Vine Street to Donald Drive ( approx . 3 , 100 LF ) and full - depth concrete from Donald Drive to Canterbury Drive ( approx . 2 , 000 LF ). The existing concrete pavement is proposed to be removed and replaced with 8 ” nonreinforced dowel jointed ( NRDJ ) Portland Cement Concrete Pavement ( PCCP ) on a 6 ” crushed stone base and geosynthetic reinforcement . The portion of street with asphalt pavement shall be core tested to include the base to determine suitability for a mill and overlay . If found unsuitable for a mill and overlay due to poor base concerns , the alternate would be 8 ” non - reinforced dowel jointed ( NRDJ ) Portland Cement Concrete Pavement ( PCCP ) on a 6 ” crushed stone base and geosynthetic reinforcement . For this design it is assumed that curb and gutter , sidewalk , and entrance pavement will only be replaced as needed unless otherwise recommended upon field survey . In the cost estimate , it is assumed that 10 % of these items will be replaced . ADA - compliant sidewalk ramps will need to be constructed at all street intersections . New pavement markings would be included in the project . Project 2 – Project 2 includes two street segments for design and reconstruction . The first is Oak Street from 27th Street to 29th Street which is a 40 ’ wide ( BOC to BOC ) 2 - lane collector street and is approximately 65 years old . It is heavily utilized for local residents and as primary access to adjacent schools . The centerline length of the street to be reconstructed is approximately 1 , 150 LF . Current pavement is comprised mostly of full - depth concrete , much of which has been overlayed with asphalt to the flow - line of the curb and gutter . The existing concrete pavement is proposed to be removed and replaced with 8 ” nonreinforced dowel jointed ( NRDJ ) Portland Cement Concrete Pavement ( PCCP ) on a 6 ” crushed stone base and geosynthetic reinforcement . For this design it is assumed that the majority of the curb and gutter will be replaced due to the asphalt overlay . Sidewalk and entrance pavement will only be replaced as needed unless otherwise recommended upon field survey . In the cost estimate , it is assumed that an estimated 10 % of these items will be replaced . ADA - compliant sidewalk ramps will need to be constructed at all street intersections if not yet existing . New pavement markings would be included in the project . Project 1 - 22nd Street from Vine Street to Canterbury Drive is a 35 ’ wide 2 - lane major collector street that carries approximately 6 , 000 vehicles per day . This street segment is approximately 60 years old and is a main thoroughfare for residents living in the area and to nearby businesses and Hays Medical Center . The centerline length of the street to be reconstructed is approximately 5 , 100 LF . Current pavement is a combination of full depth asphalt from Vine Street to Donald Drive ( approx . 3 , 100 LF ) and full - depth concrete from Donald Drive to Canterbury Drive ( approx . 2 , 000 LF ). The existing concrete pavement is proposed to be removed and replaced with 8 ” nonreinforced dowel jointed ( NRDJ ) Portland Cement Concrete Pavement ( PCCP ) on a 6 ” crushed stone base and geosynthetic reinforcement . The portion of street with asphalt pavement shall be core tested to include the base to determine suitability for a mill and overlay . If found unsuitable for a mill and overlay due to poor base concerns , the alternate would be 8 ” non - reinforced dowel jointed ( NRDJ ) Portland Cement Concrete Pavement ( PCCP ) on a 6 ” crushed stone base and geosynthetic reinforcement . For this design it is assumed that curb and gutter , sidewalk , and entrance pavement will only be replaced as needed unless otherwise recommended upon field survey . In the cost estimate , it is assumed that 10 % of these items will be replaced . ADA - compliant sidewalk ramps will need to be constructed at all street intersections . New pavement markings would be included in the project . Project 2 – Project 2 includes two street segments for design and reconstruction . The first is Oak Street from 27th Street to 29th Street which is a 40 ’ wide ( BOC to BOC ) 2 - lane collector street and is approximately 65 years old . It is heavily utilized for local residents and as primary access to adjacent schools . The centerline length of the street to be reconstructed is approximately 1 , 150 LF . Current pavement is comprised mostly of full - depth concrete , much of which has been overlayed with asphalt to the flow - line of the curb and gutter . The existing concrete pavement is proposed to be removed and replaced with 8 ” nonreinforced dowel jointed ( NRDJ ) Portland Cement Concrete Pavement ( PCCP ) on a 6 ” crushed stone base and geosynthetic reinforcement . For this design it is assumed that the majority of the curb and gutter will be replaced due to the asphalt overlay . Sidewalk and entrance pavement will only be replaced as needed unless otherwise recommended upon field survey . In the cost estimate , it is assumed that an estimated 10 % of these items will be replaced . ADA - compliant sidewalk ramps will need to be constructed at all street intersections if not yet existing . New pavement markings would be included in the project .

Location

Country

United States of America (USA)

State

Kansas

Source

Source

Kansas Purchasing Group

URL

More Details

Record type

Tender

Sector

Road, Hospital, Cement, Automotive, Car parking

Article published date

2026-04-08

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender