Design Engineering Services for Reconstruction
Sector: Road • Location: Kansas, United States of America
Source: Kansas Purchasing Group
Project 1 - 22nd Street from Vine Street to Canterbury Drive is a 35 ’ wide 2 - lane major collector street that carries approximately 6 , 000 vehicles per day . This street segment is approximately 60 years old and is a main thoroughfare for residents living in the area and to nearby businesses and Hay
- Status
- Closed
- Sector
- Road, Hospital, Cement, Automotive, Car parking
- Location
- Kansas, United States of America
- Updated
- 3 Nov 2026
- Source
- Kansas Purchasing Group
ConstructChat
Ask ConstructChat about Design Engineering Services for Reconstruction
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | Project 1 - 22nd Street from Vine Street to Canterbury Drive is a 35 ’ wide 2 - lane major collector street that carries approximately 6 , 000 vehicles per day . This street segment is approximately 60 years old and is a main thoroughfare for residents living in the area and to nearby businesses and Hays Medical Center . The centerline length of the street to be reconstructed is approximately 5 , 100 LF . Current pavement is a combination of full depth asphalt from Vine Street to Donald Drive ( approx . 3 , 100 LF ) and full - depth concrete from Donald Drive to Canterbury Drive ( approx . 2 , 000 LF ). The existing concrete pavement is proposed to be removed and replaced with 8 ” nonreinforced dowel jointed ( NRDJ ) Portland Cement Concrete Pavement ( PCCP ) on a 6 ” crushed stone base and geosynthetic reinforcement . The portion of street with asphalt pavement shall be core tested to include the base to determine suitability for a mill and overlay . If found unsuitable for a mill and overlay due to poor base concerns , the alternate would be 8 ” non - reinforced dowel jointed ( NRDJ ) Portland Cement Concrete Pavement ( PCCP ) on a 6 ” crushed stone base and geosynthetic reinforcement . For this design it is assumed that curb and gutter , sidewalk , and entrance pavement will only be replaced as needed unless otherwise recommended upon field survey . In the cost estimate , it is assumed that 10 % of these items will be replaced . ADA - compliant sidewalk ramps will need to be constructed at all street intersections . New pavement markings would be included in the project . Project 2 – Project 2 includes two street segments for design and reconstruction . The first is Oak Street from 27th Street to 29th Street which is a 40 ’ wide ( BOC to BOC ) 2 - lane collector street and is approximately 65 years old . It is heavily utilized for local residents and as primary access to adjacent schools . The centerline length of the street to be reconstructed is approximately 1 , 150 LF . Current pavement is comprised mostly of full - depth concrete , much of which has been overlayed with asphalt to the flow - line of the curb and gutter . The existing concrete pavement is proposed to be removed and replaced with 8 ” nonreinforced dowel jointed ( NRDJ ) Portland Cement Concrete Pavement ( PCCP ) on a 6 ” crushed stone base and geosynthetic reinforcement . For this design it is assumed that the majority of the curb and gutter will be replaced due to the asphalt overlay . Sidewalk and entrance pavement will only be replaced as needed unless otherwise recommended upon field survey . In the cost estimate , it is assumed that an estimated 10 % of these items will be replaced . ADA - compliant sidewalk ramps will need to be constructed at all street intersections if not yet existing . New pavement markings would be included in the project . Project 1 - 22nd Street from Vine Street to Canterbury Drive is a 35 ’ wide 2 - lane major collector street that carries approximately 6 , 000 vehicles per day . This street segment is approximately 60 years old and is a main thoroughfare for residents living in the area and to nearby businesses and Hays Medical Center . The centerline length of the street to be reconstructed is approximately 5 , 100 LF . Current pavement is a combination of full depth asphalt from Vine Street to Donald Drive ( approx . 3 , 100 LF ) and full - depth concrete from Donald Drive to Canterbury Drive ( approx . 2 , 000 LF ). The existing concrete pavement is proposed to be removed and replaced with 8 ” nonreinforced dowel jointed ( NRDJ ) Portland Cement Concrete Pavement ( PCCP ) on a 6 ” crushed stone base and geosynthetic reinforcement . The portion of street with asphalt pavement shall be core tested to include the base to determine suitability for a mill and overlay . If found unsuitable for a mill and overlay due to poor base concerns , the alternate would be 8 ” non - reinforced dowel jointed ( NRDJ ) Portland Cement Concrete Pavement ( PCCP ) on a 6 ” crushed stone base and geosynthetic reinforcement . For this design it is assumed that curb and gutter , sidewalk , and entrance pavement will only be replaced as needed unless otherwise recommended upon field survey . In the cost estimate , it is assumed that 10 % of these items will be replaced . ADA - compliant sidewalk ramps will need to be constructed at all street intersections . New pavement markings would be included in the project . Project 2 – Project 2 includes two street segments for design and reconstruction . The first is Oak Street from 27th Street to 29th Street which is a 40 ’ wide ( BOC to BOC ) 2 - lane collector street and is approximately 65 years old . It is heavily utilized for local residents and as primary access to adjacent schools . The centerline length of the street to be reconstructed is approximately 1 , 150 LF . Current pavement is comprised mostly of full - depth concrete , much of which has been overlayed with asphalt to the flow - line of the curb and gutter . The existing concrete pavement is proposed to be removed and replaced with 8 ” nonreinforced dowel jointed ( NRDJ ) Portland Cement Concrete Pavement ( PCCP ) on a 6 ” crushed stone base and geosynthetic reinforcement . For this design it is assumed that the majority of the curb and gutter will be replaced due to the asphalt overlay . Sidewalk and entrance pavement will only be replaced as needed unless otherwise recommended upon field survey . In the cost estimate , it is assumed that an estimated 10 % of these items will be replaced . ADA - compliant sidewalk ramps will need to be constructed at all street intersections if not yet existing . New pavement markings would be included in the project . |
Location
Country | United States of America (USA) |
State | Kansas |
Source
Source | Kansas Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Road, Hospital, Cement, Automotive, Car parking |
Article published date | 2026-04-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Road tenders in United States of America
- RFP - Pro-Tem Hearing Examiner
- NEW TIRES RETREADS AND TIRE SERVICES
- Professional Construction Engineering and Inspection CEI Services for the Williamson Boulevard Widening
- Lincoln Avenue Wascher to Killarney Preliminary Engineering Section 220065800PV
- KilleenFort Hood Regional Airport KFHRA Terminal Apron Rehabilitation Phase II
- IFB 947902022JM Screening 10 Asphalt Filter Stone 8 Granite Double Washed
- IFB 914202022AM Street Sweeper Parts and Brooms
- IFB 843402021AB Hay Alfalfa and Wheat Straw for Norfolk Zoo
