Design of H3AT Control Room
Planning · United Kingdom
Source: Find a Tender Service (UK)
The project involves the development of a dedicated Control Room environment to support H3AT operations. The design must consider Human Factors and Ergonomics, operator workflows, sightlines, accessibility, and future expansion requirements. Mandatory Scope The Contractor shall be responsible for: - Undertaking a detailed survey of the existing room and supporting infrastructure. - Developing the
- Status
- Prospective
- Sector
- Residential, Commercial
- Location
- United Kingdom
- Updated
- 3 Nov 2026
- Source
- Find a Tender Service (UK)
ConstructChat
Ask ConstructChat about Design of H3AT Control Room
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | planning |
Taiyo status | Prospective |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | The project involves the development of a dedicated Control Room environment to support H3AT operations. The design must consider Human Factors and Ergonomics, operator workflows, sightlines, accessibility, and future expansion requirements. Mandatory Scope The Contractor shall be responsible for: - Undertaking a detailed survey of the existing room and supporting infrastructure. - Developing the Control Room design, including layout options and the final recommended arrangement. - Undertaking Human Factors and Ergonomics assessments. - Assessing the existing electrical, lighting, HVAC and acoustic arrangements and identifying any modifications required to support the proposed design. - Specifying the Control Room furniture package. The furniture package requirements will include: - Six operator workstations. - One engineering workstation. - One security and communications workstation. - One office desk. - Seating, storage units and cable management systems. It should be noted that the operator and engineering workstations are bespoke Control Room consoles/workstations designed specifically for operational control room environments and are not standard off-the-shelf office furniture. The Contractor will be responsible for designing Control Room furniture solutions that satisfy the project requirements. Key deliverables will include: - Existing Room Survey Report. - Control Room Layout Options. - General Arrangement Drawings. - Human Factors and Ergonomics Assessment. - Furniture Schedule and Datasheets. - Electrical, Lighting, HVAC and Acoustic Assessment Reports. - Requirements Compliance Matrix. - SAT Documentation. Responses should be formatted in such a way that it is clear that your organisation can meet the requirements, there is no standardised format required. questions are welcomed and will be answered as soon as possible. |
Budget |
Location
Country | United Kingdom (UK) |
Source
Source | Find a Tender Service (UK) |
URL |
More Details
Record type | Tender |
Sector | Residential, Commercial |
Article published date | 2026-10-31 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Residential tenders in United Kingdom
- Framework Agreement for Mechanical, Electrical and Plumbing (MEP) supplies for British Embassy in Kathmandu (Nepal)
- The Core Refurbishment - CAT A Works
- Eclipse Finance Module
- Kettlethorpe High School ~ Cleaning Tender
- Housing Maintenance Support Contract
- Housing Maintenance Support Contract
- Aerial Imaging and Mapping Rhododendron ponticum
- DLS Case Management IT Refresh
