logo

Design, Supply, Testing and Commissioning of a fully integrated Battery Energy Storage System BESS of 120KW/6hrs at New Melli, Sikkim on a turnkey basis

Sector: Residential • Location: India

Source: Central Public Procurement Portal (CPPP)

Tender
Prospective

Design, Supply, Testing and Commissioning of a fully integrated Battery Energy Storage System BESS of 120KW/6hrs at New Melli, Sikkim on a turnkey basis

Status
Closed
Sector
Residential, Energy Storage, Commercial
Location
India
Updated
3 Nov 2026
Source
Central Public Procurement Portal (CPPP)

ConstructChat

Ask ConstructChat about Design, Supply, Testing and Commissioning of a fully integrated Battery Energy Storage System BESS of 120KW/6hrs at New Melli, Sikkim on a turnkey basis

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “Design, Supply, Testing and Commissioning of a fully integrated Battery Energy Storage System BESS of 120KW/6hrs at New Melli, Sikkim on a turnkey basis” is a tender record in Taiyo, linked to the Residential sector. It is issued for works, goods, or services related to India.

Participants

Not available for this record.

Status

Original status

prospective

Taiyo status

Closed

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

Design, Supply, Testing and Commissioning of a fully integrated Battery Energy Storage System BESS of 120KW/6hrs at New Melli, Sikkim on a turnkey basis

Location

Country

India

Source

Source

Central Public Procurement Portal (CPPP)

URL

More Details

Record type

Tender

Sector

Residential, Energy Storage, Commercial

Article published date

2025-12-11

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender