Detention Center Cooling Tower Rebuild
Bids closed Apr 2026 · North Carolina · Last reported Mar 2026
Source: North Carolina Purchasing Group
• Mobilize and set up jobsite . o Complete necessary site access procedure for the Detention Center . o Contractor staging area onsite shall include 3 parking spots adjacent to the cooling towers . o Receive materials upon delivery . Factory components may ship directly to the job site prior to contractor ’ s
- Status
- Closed
- Sector
- Water Supply and Storage, Steel, Manufacturing (Industrial), Car parking, Seaport, Automotive
- Location
- North Carolina, United States of America
- Updated
- 3 Nov 2026
- Source
- North Carolina Purchasing Group
ConstructChat
Ask ConstructChat about Detention Center Cooling Tower Rebuild
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | • Mobilize and set up jobsite . o Complete necessary site access procedure for the Detention Center . o Contractor staging area onsite shall include 3 parking spots adjacent to the cooling towers . o Receive materials upon delivery . Factory components may ship directly to the job site prior to contractor ’ s arrival . Contractor responsible for offload of the materials upon delivery , storage protection and stage at the site . o Contractor shall provide the jobsite dumpsters for proper disposal of materials . • Fill , Air Inlet Louver , and drift eliminator material replacement o Remove the existing scaled PVC fill material and fill supports from the cooling towers . o Once the material has been removed from the tower , pressure wash the entire interior of the cells ( including basins ) to remove heavy bio growth , sediment , and algae . o Mineral scale removal to the extent that it can be removed without producing damage to the underlying substrate . Any damage to existing materials to remain must be repaired or replaced by the contractor . o Place the old fill material , debris , and trash into job site dumpsters that are provided by the contractor . o Furnish and install new original equipment manufacturer ( OEM ) BAC Versacross fill material with an integral louver and integral drift eliminator design . Include new galvanized fill support brackets and support bars . o Install via manufacturer installation instructions . • Water Baffles Replacement o Remove the existing deteriorated water baffles ( located above the fill material ). Place the deteriorated material into job site dumpsters for disposal . o Furnish and install new hot dip galvanized OEM water baffles . o All hardware and fasteners shall be stainless steel . • Structural Corner Column Replacement o Remove the ( quantity 1 ) heavily corroded / deteriorated structural corner on the East Cell . o Place the deteriorated structural corner column into the job site dumpsters for disposal . o Furnish and install a new hot dip galvanized structural corner column to match the original equipment construction . o Includes new stainless - steel hardware and fasteners . |
Location
Country | United States of America (USA) |
State | North Carolina |
Source
Source | North Carolina Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Water Supply and Storage, Steel, Manufacturing (Industrial), Car parking, Seaport, Automotive |
Article published date | 2026-05-05 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Water Supply and Storage tenders in United States of America
- RFP - Thurston County Lake Management Districts Submerged Aquatic Vegetation Control
- Coatings for Wet Well and Manholes
- Sole Source for Wedeco UV BulbsBallets
- Security Hardware Services
- Chambers Creek Regional Wastewater Treatment Plant BNR Aeration Basin Airflow Meters
- Se Dixie Highway County Road A1A Utility Relocation Project
- UNPAINTED SNOW FENCE AND DUNE GRASS NO II
- PreQualification of Bidders for Chaboya Improvements
