logo

Detention Center Cooling Tower Rebuild

Bids closed Apr 2026 · North Carolina · Last reported Mar 2026

Source: North Carolina Purchasing Group

Tender
Closed

• Mobilize and set up jobsite . o Complete necessary site access procedure for the Detention Center . o Contractor staging area onsite shall include 3 parking spots adjacent to the cooling towers . o Receive materials upon delivery . Factory components may ship directly to the job site prior to contractor ’ s

Status
Closed
Sector
Water Supply and Storage, Steel, Manufacturing (Industrial), Car parking, Seaport, Automotive
Location
North Carolina, United States of America
Updated
3 Nov 2026
Source
North Carolina Purchasing Group

ConstructChat

Ask ConstructChat about Detention Center Cooling Tower Rebuild

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “Detention Center Cooling Tower Rebuild” is a tender record in Taiyo, linked to the Water Supply and Storage sector. It is issued for works, goods, or services related to North Carolina, United States of America.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

• Mobilize and set up jobsite . o Complete necessary site access procedure for the Detention Center . o Contractor staging area onsite shall include 3 parking spots adjacent to the cooling towers . o Receive materials upon delivery . Factory components may ship directly to the job site prior to contractor ’ s arrival . Contractor responsible for offload of the materials upon delivery , storage protection and stage at the site . o Contractor shall provide the jobsite dumpsters for proper disposal of materials . • Fill , Air Inlet Louver , and drift eliminator material replacement o Remove the existing scaled PVC fill material and fill supports from the cooling towers . o Once the material has been removed from the tower , pressure wash the entire interior of the cells ( including basins ) to remove heavy bio growth , sediment , and algae . o Mineral scale removal to the extent that it can be removed without producing damage to the underlying substrate . Any damage to existing materials to remain must be repaired or replaced by the contractor . o Place the old fill material , debris , and trash into job site dumpsters that are provided by the contractor . o Furnish and install new original equipment manufacturer ( OEM ) BAC Versacross fill material with an integral louver and integral drift eliminator design . Include new galvanized fill support brackets and support bars . o Install via manufacturer installation instructions . • Water Baffles Replacement o Remove the existing deteriorated water baffles ( located above the fill material ). Place the deteriorated material into job site dumpsters for disposal . o Furnish and install new hot dip galvanized OEM water baffles . o All hardware and fasteners shall be stainless steel . • Structural Corner Column Replacement o Remove the ( quantity 1 ) heavily corroded / deteriorated structural corner on the East Cell . o Place the deteriorated structural corner column into the job site dumpsters for disposal . o Furnish and install a new hot dip galvanized structural corner column to match the original equipment construction . o Includes new stainless - steel hardware and fasteners .

Location

Country

United States of America (USA)

State

North Carolina

Source

Source

North Carolina Purchasing Group

URL

More Details

Record type

Tender

Sector

Water Supply and Storage, Steel, Manufacturing (Industrial), Car parking, Seaport, Automotive

Article published date

2026-05-05

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender