logo

DHR Colbert Co HVAC PM FY26

One of 10,000+ tenders Taiyo tracks in Alabama.

Source: Alabama Purchasing Group

Tender
Closed

All PM service requirements and repairs for DHR are to be performed by a State of Alabama HVAC licensed contractor and hold a State of Alabama refrigeration license certified by the Alabama Board of Heating , Air Conditioning , and Refrigeration Contractors . Supplier must hold a State of Alabama Gasfitter

Status
Closed
Sector
Oil and Gas, Chemical (Industrial), Water Supply and Storage, Manufacturing (Industrial), Commercial, Residential
Location
Alabama, United States of America
Updated
3 Nov 2026
Source
Alabama Purchasing Group

ConstructChat

Ask ConstructChat about DHR Colbert Co HVAC PM FY26

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “DHR Colbert Co HVAC PM FY26” is a tender record in Taiyo, linked to the Oil and Gas sector. It is issued for works, goods, or services related to Alabama, United States of America.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

All PM service requirements and repairs for DHR are to be performed by a State of Alabama HVAC licensed contractor and hold a State of Alabama refrigeration license certified by the Alabama Board of Heating , Air Conditioning , and Refrigeration Contractors . Supplier must hold a State of Alabama Gasfitter plumber license and hold Master gasfitter certification certified by Alabama Plummers and Gasfitters Examining Board for servicing all gas fired equipment . All licenses required for Contractor and technicians working on DHR equipment shall be current at time of award and shall remain current throughout subsequent agreement . Technicians that service DHR equipment handling refrigerants shall hold universal refrigeration certification from EPA ( Environmental Protection Agency ), per code requirement section 608 , and shall have current certification at time of award and certification shall remain current throughout subsequent agreement . Technicians performing service work to DHR equipment shall be trained and skilled at time of award in the following : Service work experience in all applicable brands of HVAC commercial systems at each county office and as shown on the county equipment list provided with this solicitation . Gas and electric boilers , air - and water - cooled chillers , closed loop , water source heat pump , mini splits , split systems , packaged units , furnaces , and all other equipment included in DHR equipment list provided with this solicitation . Any brand specific factory certifications should be available upon request . Required training as per HVAC commercial industry standards and this skill level must be maintained throughout the subsequent agreement , in service and repair on DHR equipment . Apprentices must be accompanied by knowledgeable , skilled technicians to service and repair DHR equipment , and all must have refrigeration card on person while on DHR property working on HVAC equipment . Refrigeration cards do not apply to technician servicing boilers . Upon award , Supplier shall provide a list of technician ’ s names that will service DHR , that currently hold EPA certification and provide a copy of the current EPA certification which shall be used as written verification of knowledge and skill level of technician ( s ). PM Schedule for HVAC Systems : All PM services shall be performed once per quarter and in sequential order within each quarter to ensure inspections are not completed back - to - back months between quarters . Example : maintenance completed in 1st quarter , during 2nd month , will be completed in 2nd quarter during , 2nd month . PM Labor / Travel and Mileage / Material and Supplies : Supplier unit price bid shall represent quarterly PM service total costs per location . Unit price for PM services shall include all tools , filters , travel , labor , and equipment necessary . Replacement Filters : All replacement filters shall be pleated , including HEPA filters , and all filter ’ s must be replaced quarterly – no exceptions . All standard pleated filters shall comply with a MERV rating 10 for the specific HVAC system and building conditions . No fiberglass filters shall be used . HEPA filters shall be replaced with HEPA filters . Boiler filters shall be pleated filters . Size is determined by system in place . Installation must adhere to HVAC industry best practices to maintain system performance and indoor air quality . Supplier Service Requirements : After award , all PM quarterly inspections are scheduled by appointment only . Supplier shall schedule in advance through DHR County Office . County Office appointment hours are provided M - F , 8 : 30 A . M .- 4 : 00 P . M ., excluding weekends and Holidays . Upon arrival for each PM service , the technician shall sign in at the DHR County Office Front Desk and technician must report to authorized personnel – Finance Officer , their back up or Office Director prior to start of inspection . Each quarter during PM service , the technician shall replace all air filters and shall label all filters with the following information : Service technician initials , company name , filter replacement date , and HVAC unit number . Washable type filters shall be washed on site and reinstalled in lieu of replacement . Technicians shall take pictures before and after cleaning at quarterly inspections . Pictures shall contain date and time taken . Technician pictures must show old filters removed and new filters installed with labeling as detailed above . These pictures shall be provided to DHR County Office personnel for review prior to technician leaving the site . All pictures shall be reviewed including pictures of shroud removal to show before and after cleaning of condensing coil , drain pan , heads on mini splits , louvers , air filters , and exhaust fans . Inspection reports shall be signed and reviewed by Technician and DHR authorized personnel to confirm service completion . Any issues or needed repairs should be discussed on day of PM prior to technician leaving the site . Analysis of Water Treatment and Testing : Water treatment and testing is required on all HVAC systems that utilize water in heating or cooling the DHR buildings . Presently , there are eleven ( 11 ) DHR county offices that have a system of this type . These counties are : Baldwin , Blount , Calhoun , Chilton , Cullman , Elmore , Etowah , Jefferson Bessemer , Madison , Morgan , St . Clair . The awarded supplier of the preventive maintenance PO for those DHR offices with water systems shall use a company that is certified in water treatment testing for HVAC system inspection . Water treatment reports will be submitted prior to payment of invoice . The supplier shall provide information on water treatment and testing company along with their certifications to the county office and DHR Purchasing upon receipt of PO . The supplier awarded the resulting HVAC PO shall be responsible for the cost of all materials , equipment , or other related costs for maintaining a proper balance in the water system . Upon the completion of each quarterly water treatment test , a copy of each service and / or analysis report shall immediately be furnished to the DHR County Office authorized personnel . HVAC PM tasks required annually : Once per year , Supplier shall check freon replacement levels and add freon as needed to bring levels back in line with equipment manufacturer requirements . HVAC PM tasks required twice per year : Deep clean all condenser coils , outside included . Remove shrouds and clean inside valley area where condenser pans are located . Deep clean evaporator coils , and clean air handler . HVAC PM tasks required Quarterly : Perform a complete system check to include review of Variable Air Volume ( VAV ) for proper operation and clean all exhaust fans . Replace all filters and wash all washable type filters per specification requirements . Check voltage and amperage on compressor , Clean / vacuum drain pans , clean indoor heads on mini splits , and clean louvers . Check system for lubrication and lubricate system as needed using manufacturer ’ s recommended coil cleaner . Check all belts and replace belts when needed . Check all pulleys and replace as needed . Inspect wiring and electrical disconnect . Check pan tablets and add pan tablets as needed . Check primary and auxiliary drains and pans for cleanliness and clean as necessary . Check condensate pumps for proper operation and clean screens where applicable . All condensate drains shall be cleaned with compressed air or an industry - standard chemical agent that poses no environmental threat . Check vents . Clean blower wheels and fan blades to ensure proper air flow . Review system for potential needed repairs . Chiller PM Quarterly Requirements : Check for proper refrigerant charge . Check for control calibration and operation . Inspect main electrical components , check for overheating , and tighten if necessary . Inspect compressor operating oil level . Check compressor unloading and / or capacity control mechanisms . Check and record refrigerant sub - cooling . Check for refrigerant contamination and moisture . Check and record compressor voltage and amperage . Properly check expansion tank pressure . Inspect all pumps , motors , and bearings . Lubricate per manufacturer recommendations . Check crankcase heater . Cooling Tower PM Quarterly Requirements : Check all belt tension and adjust as needed Check fan blades for cracks and vibrations . Check sheaves and bushings for water . Check motor operation and grease bearings . Check for proper operation of pumps and sprayer heads .

Location

Country

United States of America (USA)

State

Alabama

Source

Source

Alabama Purchasing Group

URL

More Details

Record type

Tender

Sector

Oil and Gas, Chemical (Industrial), Water Supply and Storage, Manufacturing (Industrial), Commercial, Residential

Article published date

2026-05-10

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender