logo

Dillard Road Bridge Scour Countermeasures

Sector: Bridge • Location: Sacramento, California, United States of America

Source: Open Gov Tenders

Tender
Open

The Dillard Road Bridge over the Cosumnes River is located approximately 0.2 miles south of the intersection of Dillard Road and Jackson Road (State Route 16) (Attachment 1).  The bridge is a two-lane structure, approximately 350-foot long and 34-foot wide structure.  The purpose of this project is to provide scour countermeasures for pier 3 by placing rock, also known as rip-rap, around

Tender Information FAQ

Tender Information

3 Q
The tender “Dillard Road Bridge Scour Countermeasures” is a tender record in Taiyo, linked to the Bridge sector. It is issued for works, goods, or services related to Sacramento, California, United States of America.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

open

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Dillard Road Bridge over the Cosumnes River is located approximately 0.2 miles south of the intersection of Dillard Road and Jackson Road (State Route 16) (Attachment 1).  The bridge is a two-lane structure, approximately 350-foot long and 34-foot wide structure.  The purpose of this project is to provide scour countermeasures for pier 3 by placing rock, also known as rip-rap, around the base of the pier footing.  The project will also install scour countermeasures at Piers 2, 4, 5, and 6.The work to be performed under this contract includes the furnishing of all labor, materials, and equipment for:Providing scour countermeasures at Piers 2, 3, 4, and 5; and the construction of a temporary access road and temporary trestle to reach Pier 3 during construction.  At Pier 3, Class IX two-ton riprap will be embedded at a minimum depth of 9 feet and extend 24 feet in all directions around the pier.  On Piers 2 and 4, magnetic sliding collars will be attached to the face of the pier with rods driven or augured a minimum of 24 feet into the streambed.  On Pier 5, a scour chain and bead monitor will be installed.Other items or details not mentioned above that are required by these Special Provisions shall be performed, placed, constructed, or installed in accordance with the Standard Construction Specifications and these Special Provisions.  The construction, materials, and workmanship for items of work on the plans, but not specifically mentioned in these Special Provisions are referred to the Standard Construction Specifications for conformance.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data