DNR Assateague State Park Maintenance Buildings Metal Siding Replacement
Bids closed Mar 2026 · Maryland · Last reported Mar 2026
Source: Maryland Purchasing Group
SCOPE : 1 . This project consists of the Contractor providing all labor , equipment , materials , supplies , insurance , etc . necessary to replace metal siding , exterior personnel doors and exterior lighting on Three Maintenance Shop Buildings located at the Headquarters and Maintenance Shop Complex . The property is loc
- Status
- Closed
- Sector
- Road, Automotive, Metal, Steel, Commercial
- Location
- Maryland, United States of America
- Updated
- 3 Nov 2026
- Source
- Maryland Purchasing Group
ConstructChat
Ask ConstructChat about DNR Assateague State Park Maintenance Buildings Metal Siding Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | SCOPE : 1 . This project consists of the Contractor providing all labor , equipment , materials , supplies , insurance , etc . necessary to replace metal siding , exterior personnel doors and exterior lighting on Three Maintenance Shop Buildings located at the Headquarters and Maintenance Shop Complex . The property is located at 7307 Stephen Decatur Highway , Berlin , Maryland 21811 , Worcester County . 2 . The proposed project shall include but is not limited to the following : Wood Shop and Storage Building - 102 ’ x 41 ’ a . The Contractor shall remove and replace metal siding ( approximately 1 , 500 SF ) on the front elevation of the building . To include overhead door trim , base trim , door trim and outside corners . b . The Contractor shall remove and replace the metal siding from the building base to the first steel girt ( approximately 850 SF ) on the side and rear building elevations . To include base trim and outside corner trim . c . Inspect metal base angle / Fasteners and replace any rusted base angle steel as directed by the DNR Project Manager on a unit price basis . ( See Unit Price # 1 ) d . Inspect steel galvanized overhead door jambs and replace rusted metal as as directed by the DNR Project Manager on a unit price basis . ( See Unit Price # 2 ). e . The Contractor shall install new overhead door seals on side , top and door bottom seals . f . The Contractor shall remove and replace two ( 2 ) steel personnel doors . To include steel jambs , hinges , closers , panic bars and exterior metal trim . g . The Contractor shall paint the personnel doors . h . The contractor shall remove and replace exterior lighting located at each overhead door and personnel door . Automotive and Maintenance Building – 83 ’ x 41 ’ a . The Contractor shall remove and replace metal siding ( approximately 1 , 000 SF ) on the front elevation of the building . To include overhead trim , base trim , door trim and outside corners . b . The Contractor shall remove and replace the metal siding from the building base to the first steel girt ( approximately 800 SF ) on the side and rear building elevations . To include base trim and outside corners . c . Inspect metal base / fasteners and replace any rusted base angle steel as directed by the DNR Project manager on a unit price basis . ( See Unit Price # 1 ) d . Inspect galvanized overhead door jambs and replace rusted metal as directed by the DNR Project Manager on a unit price basis . ( See Unit Price # 2 ) e . The Contractor shall install new overhead door seals on side , top and door bottom seals . f . The contractor shall remove and replace three ( 3 ) steel personnel doors . To include steel jambs , hinges , closers , panic bars and exterior metal trim . g . The Contractor shall paint the personnel doors . h . The Contractor shall remove and replace exterior lighting located at each overhead door and personnel door Equipment Storage Building – 93 ’ x 41 ’ a . The contractor shall remove and replace metal siding ( approximately 1 , 000 SF ) on the front elevation of the building . To include overhead trim , base trim , door trim and outside corners . b . The Contractor shall remove and replace the metal siding from the building base to the first steel girt ( approximately 800 SF ) on the side and rear building elevations . To include base trim and outside corner trim . c . Inspect metal base angle / fasteners and replace any rusted base angle steel as directed by the DNR Project Manager on a unit price basis . ( See Unit Price # 1 ) d . Inspect galvanized overhead door jambs and replace rusted metal as directed by the DNR Project Manager on unit price basis . ( See Unit Price # 2 ) |
Location
Country | United States of America (USA) |
State | Maryland |
Source
Source | Maryland Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Road, Automotive, Metal, Steel, Commercial |
Article published date | 2026-04-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender