Dodge Hall Abatement
Sector: Water Supply and Storage • Location: Oakland, Mitn, United States of America
Source: Oakland University
Scope : Removal of floor tile and mastic as outlined on the demo . plans . Removal of lab tables and fumes as outlined on plans . Pipe and fitting removal in areas outlined on plans . Main Basement Mech . Room : Removal of approximately 90 ln . ft . of asbestos and fiberglass pipe insulation and approximately 30
- Status
- Closed
- Sector
- Water Supply and Storage, Education, Car parking, Automotive
- Location
- Oakland, Mitn, United States of America
- Updated
- 3 Nov 2026
- Source
- Oakland University
ConstructChat
Ask ConstructChat about Dodge Hall Abatement
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | Scope : Removal of floor tile and mastic as outlined on the demo . plans . Removal of lab tables and fumes as outlined on plans . Pipe and fitting removal in areas outlined on plans . Main Basement Mech . Room : Removal of approximately 90 ln . ft . of asbestos and fiberglass pipe insulation and approximately 30 asbestos insulated pipe fittings from chilled water piping . Removal of approximately 850 sq . ft . of asbestos containing duct insulation from supply fan # 3 . Removal of approximately 7 asbestos insulated pipe fittings associated with the domestic hot water storage tank . Removal of approximately 40 sq . ft . of asbestos air separator tank insulation . Removal of approximately 100 lineal ft . of asbestos and fiberglass pipe insulation and approximately 30 asbestos insulation pipe fittings from heating lines and heat exchanger . 4th Floor Mech . RoomRemoval of approximately 940 sq . ft . of asbestos duct insulation from supply fan . Removal of approximately 30 asbestos insulated pipe fittings . Lecture Hall Mech . RoomRemoval of approximately 1 , 050 sq . ft . of asbestos duct insulation from supply fan . Removal of approximately 30 asbestos insulated pipe fittings . Project will be phased – refer to phasing plans : Phase 1 – summer 2026Phase 2 – fall 2027See more |
Location
Country | United States of America (USA) |
State | Mitn |
City | Oakland |
Source
Source | Oakland University |
URL |
More Details
Record type | Tender |
Sector | Water Supply and Storage, Education, Car parking, Automotive |
Article published date | 2026-04-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Water Supply and Storage tenders in United States of America
- RFP - Thurston County Lake Management Districts Submerged Aquatic Vegetation Control
- Coatings for Wet Well and Manholes
- Sole Source for Wedeco UV BulbsBallets
- Security Hardware Services
- Chambers Creek Regional Wastewater Treatment Plant BNR Aeration Basin Airflow Meters
- Se Dixie Highway County Road A1A Utility Relocation Project
- UNPAINTED SNOW FENCE AND DUNE GRASS NO II
- PreQualification of Bidders for Chaboya Improvements
