Downtown Infrastructure Project
One of 2,790 tenders Taiyo tracks in New Hampshire.
Source: New Hampshire Purchasing Group
The City of Keene is seeking qualified bidders for the Downtown Infrastructure Improvements and Reconstruction Project . The project limits are on Main Street and Central Square from the southernmost end on Water Street , continuing north to Court / Washington Street at the northernmost limit of the project . Th
- Status
- Closed
- Sector
- Road, Water Supply and Storage, Cement, Rail, Waste Processing and Treatment, Car parking, Automotive
- Location
- New Hampshire, United States of America
- Updated
- 3 Nov 2026
- Source
- New Hampshire Purchasing Group
ConstructChat
Ask ConstructChat about Downtown Infrastructure Project
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | The City of Keene is seeking qualified bidders for the Downtown Infrastructure Improvements and Reconstruction Project . The project limits are on Main Street and Central Square from the southernmost end on Water Street , continuing north to Court / Washington Street at the northernmost limit of the project . The project as specified in the contract documents is comprised of two phases of construction , divided at the Main Street / Railroad Street / Gilbo Street intersection that are required to be completed separately over the 2026 and 2027 construction seasons . The scope of the project includes , but is not expressly limited to furnishing and installing the following for the project : - Drain system improvements , including roughly 6 , 300 LF of drain culvert removal and replacement for HDPE culvert diameters between 10 ” and 36 ” and 80 stormwater structures ( catch basins , drop inlets and drain manholes ). - Water system improvements including the removal , replacement and installation of roughly 6 , 000 LF of 6 ”, 8 ” 12 ” and 16 ” DI CL52 water main , 65 gate valves and boxes , 16 hydrants and 1 , 500 LF of water services . - Sewer system improvements , including roughly 6 , 600 LF of 6 ”, 8 ” and 10 ” PVC Sewer and 40 sewer manholes . - Raised stamped concrete intersections and rapid flashing pedestrian beacons - Approximately 18 , 000 SY of concrete sidewalks and textured concrete sidewalks , - Approximately 11 , 000 LF of granite curb and 7 , 000 LF of granite curb resetting - Electrical panel enclosure , temporary lighting , replacement lighting , conduit , wiring and ancillary electrical improvements . - Traffic signal removal and replacement for Central Square . - Landscaping within the project limits , including : roughly 170 trees , 480 shrubs , 7 , 000 perennial plantings , loam , seed , tree soil cells , mulch . - Ancillary landscaping and site features include benches , bike racks , bollards , lighted bollards , seat boulders . - Signage removal and replacement within the project limits . - The removal and replacement of the existing irrigation system ( s ) for the project limits . - The removal and resetting of existing site features like benches , parking pay machines , clock tower , flag poles . - The removal and disposal of roughly 9 , 100 LF of existing CMP storm drain and 75 existing stormwater structures - Associated maintenance of traffic , erosion controls , SWPPP management , road and sidewalk reconstruction , pavement markings lines and symbols restoration / reinstatement within the project limits . |
Location
Country | United States of America (USA) |
State | New Hampshire |
Source
Source | New Hampshire Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Road, Water Supply and Storage, Cement, Rail, Waste Processing and Treatment, Car parking, Automotive |
Article published date | 2026-04-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Road tenders in United States of America
- RFP - Pro-Tem Hearing Examiner
- NEW TIRES RETREADS AND TIRE SERVICES
- Professional Construction Engineering and Inspection CEI Services for the Williamson Boulevard Widening
- Lincoln Avenue Wascher to Killarney Preliminary Engineering Section 220065800PV
- KilleenFort Hood Regional Airport KFHRA Terminal Apron Rehabilitation Phase II
- IFB 947902022JM Screening 10 Asphalt Filter Stone 8 Granite Double Washed
- IFB 914202022AM Street Sweeper Parts and Brooms
- IFB 843402021AB Hay Alfalfa and Wheat Straw for Norfolk Zoo
