DPW - 2026 Paving Projects
Sector: Road • Location: New Hampshire, United States of America
Source: New Hampshire Purchasing Group
The City ’ s summer roadway paving project which includes Sections ( see attached maps ), may include one or a combination of the following tasks with descriptions listed below that the contractor shall follow : • ADJUSTING STRUCTURES : • Claremont DPW will adjust structures as needed . • PAVEMENT MILLING : • All pavem
- Status
- Closed
- Sector
- Road, Water Supply and Storage, Waste Processing and Treatment
- Location
- New Hampshire, United States of America
- Updated
- 3 Nov 2026
- Source
- New Hampshire Purchasing Group
ConstructChat
Ask ConstructChat about DPW - 2026 Paving Projects
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | The City ’ s summer roadway paving project which includes Sections ( see attached maps ), may include one or a combination of the following tasks with descriptions listed below that the contractor shall follow : • ADJUSTING STRUCTURES : • Claremont DPW will adjust structures as needed . • PAVEMENT MILLING : • All pavement saw cutting may be completed after grinding operations . All 3 ” or larger asphalt chunks that are not ground shall be removed from the site by the contractor and disposed of at the DPW prior to paving . • CLAREMONT DPW : • Will need to complete water , sewer , and drainage improvements prior to any paving . • SAW CUT / MILLED JOINTS : • To match all existing pavement depth . This item is subsidiary to all other work on the project . • PAVEMENT RECYCLING : • Initial Grinding - Existing pavement surfaces shall be ground to a depth of approximately 12 ” deep , and full width of said roads , for all locations specified . • Final Grinding - Upon completion of initial grinding , 1 ½ ” crushed gravel or stone may be added where needed , across the ground portion of the roadway and then final grinding passes shall be completed to create a homogeneous mixture of the recycled asphalt and the 1 ½ ” crushed gravel or stone . ( NOTE : All pavement saw cutting may be completed after grinding operations . All 3 ” or larger asphalt chunks that are not ground shall be removed from the site by the contractor and disposed of at the DPW prior to paving ). • INITIAL GRADING & COMPACTION : • Establish the roadway centerline , finish grade and compact all ground sections of pavement . Cross - slope of the road shall be graded to 2 %+/- from the centerline or shall match the existing cross - slope of the road with prior approval from the Highway Director or foreman in charge . Existing roadway profiles may be adjusted to accommodate additional crushed gravel material with prior approval . All drainage courses shall be maintained and shall be cleaned free of debris that may fall into them . This item is subsidiary to pavement grinding that will be necessary for the project . Contractor will be responsible for erosion control . |
Location
Country | United States of America (USA) |
State | New Hampshire |
Source
Source | New Hampshire Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Road, Water Supply and Storage, Waste Processing and Treatment |
Article published date | 2026-04-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Road tenders in United States of America
- RFP - Pro-Tem Hearing Examiner
- NEW TIRES RETREADS AND TIRE SERVICES
- Professional Construction Engineering and Inspection CEI Services for the Williamson Boulevard Widening
- Lincoln Avenue Wascher to Killarney Preliminary Engineering Section 220065800PV
- KilleenFort Hood Regional Airport KFHRA Terminal Apron Rehabilitation Phase II
- IFB 947902022JM Screening 10 Asphalt Filter Stone 8 Granite Double Washed
- IFB 914202022AM Street Sweeper Parts and Brooms
- IFB 843402021AB Hay Alfalfa and Wheat Straw for Norfolk Zoo
