logo

Dr. Bramblett Road & Goldmine Road Water Main Extensions

The scope, dates and status of this tender. A free account opens every field.

Tender
Under Evaluation

Bids for the construction of the Project will be received by the City of Cumming, Utilities Department at City Hall, 100 Main Street, 4th Floor, Suite 401, Cumming, GA 30040, until April 28, 2026 at 2:00 pm local time. At 2:05 pm, the Bids received will be announced in the 4th Floor Conference Room. Any bid received after 2:00 pm will be returned unopened.Work of this Project generally includes th

Status
Closed
Sector
Road, Power Transmission, Power Generation (CCGT), Government
Location
Georgia, United States of America
Updated
3 Nov 2026
Source
Georgia Procurement Registry

ConstructChat

Ask ConstructChat about Dr. Bramblett Road & Goldmine Road Water Main Extensions

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “Dr. Bramblett Road & Goldmine Road Water Main Extensions” is a tender record in Taiyo, linked to the Road sector. It is issued for works, goods, or services related to Georgia, United States.

Participants

Not available for this record.

Status

Original status

under evaluation

Taiyo status

Closed

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

Bids for the construction of the Project will be received by the City of Cumming, Utilities Department at City Hall, 100 Main Street, 4th Floor, Suite 401, Cumming, GA 30040, until April 28, 2026 at 2:00 pm local time. At 2:05 pm, the Bids received will be announced in the 4th Floor Conference Room. Any bid received after 2:00 pm will be returned unopened.Work of this Project generally includes the design and construction of new potable water mains along Dr. Bramblett Road and Goldmine Drive to improve water system performance, fire flow, and distribution capacity. Work includes, but is not limited to, the following: 1. Dr. Bramblett Road Water Main Extension a. Install approximately 2,300¿2,400 feet of new 16¿inch water main along Dr. Bramblett Road, extending the existing SR¿20 Phase II water main to the Spot Road / Spot Road Connector intersection. b. Connect to the City¿s existing distribution system in coordination with hydraulic modeling and City records. c. Improve working pressure and volume at the Spot Road connection. d. Coordinate tie¿ins and construction sequencing with C.W. Matthews if the City elects to incorporate the work into the existing SR¿20 Phase II construction contract. 2. Goldmine Drive Water Line Replacement a. Replace approximately 1,600 linear feet of existing 3¿inch water line with new 8¿inch water main from Sawnee Drive (SR 306) to the previously installed 8¿inch stub on Goldmine Drive. b. Abandon the existing 3¿inch main. c. Connect to the new 12¿inch water main at Sawnee Drive (constructed under the SR 20 project). d. Restore water services and coordinate any customer service changes with the Owner. 3. General Work Elements Applying to Both Corridors a. Perform all land¿disturbing activities required for installation of new mains, including trenching, bedding, backfill, erosion and sediment control, and final site restoration. b. Provide and maintain ES&PCP. c. Locate existing utilities through survey and utility coordination; prot

Original sector

Construction / Public Works

Location

Country

United States of America (USA)

State

Georgia

Source

Source

Georgia Procurement Registry

URL

More Details

Record type

Tender

Sector

Road, Power Transmission, Power Generation (CCGT), Government

Article published date

2026-10-22

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender