Drainage Basin Construction Project
Sector: Waste Processing and Treatment • Location: Kentucky, United States of America
Source: Kentucky Purchasing Group
The City of Bowling Green , Kentucky is soliciting bids for construction of the Fair Street Drainage Basin Project , which includes development of a stormwater detention basin and associated drainage improvements to improve stormwater management in the Fair Street area . The project generally consists of basin e
- Status
- Closed
- Sector
- Waste Processing and Treatment, Water Supply and Storage, Cement, Power Transmission, Power Generation (CCGT), Residential, Road
- Location
- Kentucky, United States of America
- Updated
- 3 Nov 2026
- Source
- Kentucky Purchasing Group
ConstructChat
Ask ConstructChat about Drainage Basin Construction Project
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | The City of Bowling Green , Kentucky is soliciting bids for construction of the Fair Street Drainage Basin Project , which includes development of a stormwater detention basin and associated drainage improvements to improve stormwater management in the Fair Street area . The project generally consists of basin excavation and grading , installation of a drywell structure , installation of storm sewer beneath Fair Street , construction of a headwall and drainage structures , and grading of an open drainage ditch . Additional work includes installation of perimeter fencing with an access gate , limited concrete pavement replacement , erosion control measures , and restoration of disturbed areas . Existing residential structures and associated utility services located at 1039 and 1041 Fair Street will be demolished and backfilled prior to the start of this contract and are not included in the scope of this project . The Contractor shall provide all labor , materials , equipment , supervision , traffic control , erosion control , and incidentals necessary to complete the project in accordance with the plans , specifications , and bid documents . |
Location
Country | United States of America (USA) |
State | Kentucky |
Source
Source | Kentucky Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Waste Processing and Treatment, Water Supply and Storage, Cement, Power Transmission, Power Generation (CCGT), Residential, Road |
Article published date | 2026-05-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Waste Processing and Treatment tenders in United States of America
- Coatings for Wet Well and Manholes
- Sole Source for Wedeco UV BulbsBallets
- Chambers Creek Regional Wastewater Treatment Plant BNR Aeration Basin Airflow Meters
- Annual Construction Contract For Utility Replacement 2022A
- FY23 Sewer Rehabilitation
- Fire Station 32 ADA Restroom Improvements
- Foothills Trail East Puyallup McMillin Trailhead Improvements
- Pipeline Trail Phase 1 Project
