logo

Drainage Rehabilitation , Repair , Replacement , & Miscellaneous Maintenance Services – District 3

The scope, dates and status of this tender. A free account opens every field.

Source: Georgia Purchasing Group

Tender
Closed

This solicitation is being conducted by the Georgia Department of Transportation under its authority to procure services ancillary to the construction and maintenance of a public road ( as defined in O . C . G . A 32 - 1 - 3 ( 24 ) as provided for in O . C . G . A 32 - 2 - 61 ( c ) and ( d ) ( 1 ) ( D ). Through this

Status
Closed
Sector
Road, Water Supply and Storage, Cement
Location
Georgia, United States of America
Updated
3 Nov 2026
Source
Georgia Purchasing Group

ConstructChat

Ask ConstructChat about Drainage Rehabilitation , Repair , Replacement , & Miscellaneous Maintenance Services – District 3

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “Drainage Rehabilitation , Repair , Replacement , & Miscellaneous Maintenance Services – District 3” is a tender record in Taiyo, linked to the Road sector. It is issued for works, goods, or services related to Georgia, United States of America.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

This solicitation is being conducted by the Georgia Department of Transportation under its authority to procure services ancillary to the construction and maintenance of a public road ( as defined in O . C . G . A 32 - 1 - 3 ( 24 ) as provided for in O . C . G . A 32 - 2 - 61 ( c ) and ( d ) ( 1 ) ( D ). Through this Invitation to Bid ( ITB ) the Georgia Department of Transportation ( hereinafter , “ the Department or GDOT ”) is seeking bids and Statements of Work from the qualified firms who have been awarded a Maintenance Master Services Agreement ( MMSA ) under a Request for Qualified Contractors ( RFQC ) ( GDOT ’ s pre - qualification process ) for Drainage Rehabilitation , Repair , Replacement , & Miscellaneous Maintenance Services . A . Scope of Work to be Performed The Contractor will be required to perform prep work , removal , installation and cleanup for Drainage Rehabilitation , Repair , Replacement , & Miscellaneous Maintenance Services defined in this ITB . The Contractor shall supply labor , equipment , tools , means of transportation , traffic control , and incidentals to perform work in accordance to specifications , and to ensure a safe work environment for employees and the traveling public within the time schedule specified . 1 . Scope Work under this ITB consists of furnishing all labor , materials , tools , equipment , means of transportation , and incidentals necessary to perform the services . Contractor must furnish equipment in good operating condition and operated by properly trained and qualified personnel . The Contractor must make a good faith effort to furnish the Department the fully operational equipment needed to perform Drainage Rehabilitation , Repair , Replacement , & Miscellaneous Maintenance Services at such time , and at such location ( s ) as directed by the Engineer . Prior to start of work , Contractor must inspect equipment to ensure the equipment is fully operational for the performance of its intended purpose . The Contractor will also be responsible for any traffic control , licenses , and permits required to satisfy the duties required herein . 2 . Deliverables Delivery of Drainage Rehabilitation , Repair , Replacement , & Miscellaneous Maintenance Services shall be in accordance with the contract terms . The following deliverables are expected for work performed at the locations referenced in Exhibit 4 - Locations , Descriptions and Estimated Quantities . Contractor shall follow all Standards and Details , specifications , and MUTCD for the duration of the work . 3 . Quality Acceptance General Provisions 101 through 150 . Payments will be based on pay items . All invoices shall be submitted with DBE forms in order for payment to be processed . The inspector shall be notified of the contractors intent to submit any invoice for payment to allow for inspection of areas to be invoiced for payment . 4 . Personnel and Sub - Contractors 4 . 1 Personnel A . Supervisor At all times , have on the work site as the Contractor ' s agent , a competent , English speaking Supervisor , thoroughly experienced in the type of work being performed . The Supervisor ’ s main duties are to supervise the work crew . Supervisor may serve as a Worksite Traffic Control Supervisor ( WTCS ) if properly certified . The Contractor ’ s Supervisor shall : 1 . Have a working cell phone with them during duty hours 2 . Must be available at the work site when the work is being performed under this Contract , and as requested ; 3 . Act as the Contractor ’ s authorized agent in all communications with the Department 4 . Shall be responsible for inspecting and reporting the need for major or emergency work to the Engineer immediately . B . Crew Utilize the same crew ( s ) to perform the work in accordance with the requirements herein , whenever possible , so that the personnel can remain familiar with the Project . 1 . Provide staff and staffing levels able to perform the work in accordance with the requirements herein . 2 . Use personnel who are competent , experienced , and skilled in all aspects of Drainage Rehabilitation , Repair , Replacement , & Miscellaneous Maintenance Services . The personnel performing these services will be under the sole responsibility of the Contractor . 4 . 2 Subcontractors The Department expects the awarded contractor to be fully able to complete the Work as detailed in this ITB . The Department may consider the use of subcontractors to accomplish the work . A . All requests to utilize a subcontractor must be submitted in writing and include the following ; 1 . Appendix 4 Subcontractor Request Form 2 . A notarized copy of Appendix 5 Georgia Security and Immigration Compliance Act Affidavit ( Subcontractor ) B . A minimum of ten ( 10 ) working days is needed to evaluate a request . C . If the Department approves the use of a subcontractor , the Contractor will be held wholly responsible for the actions , quality , and timeliness of all work performed by the subcontractor . The Department will communicate with the Contractor ’ s Supervisor regarding all work . D . Determination of whether a subcontractor is approved is the sole decision of the Department . Scope / Description of Work : Work under this contract consists of a drainage repair at MP 55 . 8 - 56 . 1 on I - 85 North Bound in Coweta County . This contract will require hauling in fill material , removing stumps and debris , concrete work , and grassing . The Contractor shall furnish all labor , materials , equipment , means of transportation , and incidentals necessary to perform work . A . The contractor shall haul in approved fill material to fill washed out areas to original grade . B . The contractor shall keep all land disturbance to less than 1 Acre . C . The Contractor shall be responsible for hauling away and disposing of all items and materials to be removed . D . The contactor shall remove all trash and debris in the work area . E . The Contractor shall remove all trees and vegetation within 25 feet of the structure on the State Right of Way to the top of the slope . The vegetation or debris may be ground and spread on site out of the way of the work . F . There is a live stream in this location . Flow shall be diverted in an acceptable manner to pressure grout below the wingwalls and outlet of culvert , pour the apron , and install riprap . The apron shall be poured to the outer edge of the wingwalls . The riprap shall be installed with appropriate geotextile fabric underneath approximately 15 - foot by 15 - foot . G . The contractor shall remove dirt and pour concrete flume along the wingwalls and parapet of the culvert to prevent further erosion . The concrete flumes shall be over the top of the parapet and to the ends of each wingwall . H . The contractor shall remove the concrete flume from just below the pipe down to the bottom of the slope , regrade the area allowing the flume to be 4 feet wide across the top and 3 foot deeper in the bottom of the flume . The contractor shall add concrete baffles down the flume to assist with the velocity of water flow . The baffles shall be at least 6 feet apart . The new flume shall extend to the bottom of the slope and turn to flow towards the stream . I . An L shaped wall may be installed to keep the water flowing on the right of way . J . A new concrete flume shall be installed from the bottom of the sloped flume to carry the water to the stream . 10 - foot by 10 - foot of riprap shall be installed with the geotechnical fabric before the stream to slow the velocity of water into the stream . K . The vegetation debris , trash , tires etc . at the bottom of the slope shall be removed and hauled to an appropriate site off the project . The vegetation may be mulched and placed outside of this area of work .

Location

Country

United States of America (USA)

State

Georgia

Source

Source

Georgia Purchasing Group

URL

More Details

Record type

Tender

Sector

Road, Water Supply and Storage, Cement

Article published date

2026-04-29

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender