DRILLED PIER FOUNDATION INSTALLATION
Bids closed Feb 2026 · Tennessee · Last reported Feb 2026
Source: Tennessee Purchasing Group
The Contractor shall furnish all work including supervision , equipment , transportation , materials , labor , and tools to install drilled pier foundations that are too large for in - house crews to install , which also includes tying of rebar , drilling , installation of anchor bolts , if needed , and placement of conc
- Status
- Closed
- Sector
- Steel, Water Supply and Storage, Cement
- Location
- Tennessee, United States of America
- Updated
- 3 Nov 2026
- Source
- Tennessee Purchasing Group
ConstructChat
Ask ConstructChat about DRILLED PIER FOUNDATION INSTALLATION
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | The Contractor shall furnish all work including supervision , equipment , transportation , materials , labor , and tools to install drilled pier foundations that are too large for in - house crews to install , which also includes tying of rebar , drilling , installation of anchor bolts , if needed , and placement of concrete pier foundations on an as needed basis in strict accordance with the Contract Documents and Specifications . |
Location
Country | United States of America (USA) |
State | Tennessee |
Source
Source | Tennessee Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Steel, Water Supply and Storage, Cement |
Article published date | 2026-05-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Steel tenders in United States of America
- Construction Materials Testing and Inspection Services for Thousand Oaks Boulevard Pedestrian Crossing CI 5398
- Street Construction Materials
- Jail Courthouse Walkway Project
- RFP 887702021MF Rapid Response Fire Boat for Norfolk FireRescue
- Millbrae Warehouse Loading Dock Repair
- Biosolids Digester Facilities - Southeast Treatment Plant T-...
- Marin Street Sewer Replacement - BID TABULATION
- Southeast Water Pollution Control Plant HVAC and Mechanical ...
