Drilling - Ca Br Ncao Shas(1) Upper Vista House Road
The scope, dates and status of this tender. A free account opens every field.
Source: SAM.gov
Subsurface pavement investigation consisting of six (6) shallow borings with associated tasks and materials. The location is in the existing parking area at the Shasta Dam Visitor Center, Shasta Lake, CA 96019
- Status
- Closed
- Sector
- Hydro, Car parking, Road, Commercial, Residential, Automotive
- Location
- Shasta Lake, California, United States of America
- Updated
- 3 Nov 2026
- Source
- SAM.gov
ConstructChat
Ask ConstructChat about Drilling - Ca Br Ncao Shas(1) Upper Vista House Road
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | combined synopsis/solicitation |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | Subsurface pavement investigation consisting of six (6) shallow borings with associated tasks and materials. The location is in the existing parking area at the Shasta Dam Visitor Center, Shasta Lake, CA 96019 |
Original sector | Professional, Scientific, and Technical Services |
Location
Country | United States of America (USA) |
State | California |
City | Shasta Lake |
Source
Source | SAM.gov |
URL |
More Details
Record type | Tender |
Sector | Hydro, Car parking, Road, Commercial, Residential, Automotive |
Article published date | 2026-02-19 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Hydro tenders in United States of America
- Landscaping (C-27 License), San Francisco, San Mateo, Santa ...
- Bay Corridor Transmission & Distribution - Phase 2 (2019) S...
- College Hill Reservoir Outlet Structure And Pipeline
- Bay Corridor Transmission and Distribution - Phase 3 (2019)
- Regional Groundwater Storage and Recovery
- Fillmore and Haight Street Intersection AWSS, Pavement, and ...
- REJECTED: Southeast Water Pollution Control Plant Power Feed...
- Turner Dam Spillway and Pond F3 East Erosion Repair
