E . Market St . Bridge Railing
Bids closed Apr 2026 · Pennsylvania · Last reported Apr 2026
Source: Pennsylvania Purchasing Group
. Contractor shall be responsible for laying out the Work including staking out all new construction . Contractor shall employ an experienced Civil Engineer / Surveyor and cause him to determine all baselines , lines and grades and to verify same from time to time during the progress of the work . For all
- Status
- Closed
- Sector
- Waste Processing and Treatment, Bridge, Water Supply and Storage
- Location
- Pennsylvania, United States of America
- Updated
- 3 Nov 2026
- Source
- Pennsylvania Purchasing Group
ConstructChat
Ask ConstructChat about E . Market St . Bridge Railing
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | . Contractor shall be responsible for laying out the Work including staking out all new construction . Contractor shall employ an experienced Civil Engineer / Surveyor and cause him to determine all baselines , lines and grades and to verify same from time to time during the progress of the work . For all sanitary sewer , storm sewer , manhole and inlet construction , prior to construction Contractor shall : - Set a PK nail at each manhole and inlet and other proposed facility and provide the elevation on the PK nail to the Engineer . The PK nails shall be placed after the existing utilities have been located and marked in the field . - Review the set PK nail locations in the field with Engineer . Upon review of the field locations , the Engineer may direct shifts and adjustments in the proposed facility locations . Such shifts and adjustments shall be expected and shall be laid out and constructed at no additional cost to the Owner . Contractor may request shifts and adjustments to the manhole or inlet locations to facilitate construction . All Contractor changes shall be subject to approval of Engineer who shall solely determine if a shift is allowed . |
Location
Country | United States of America (USA) |
State | Pennsylvania |
Source
Source | Pennsylvania Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Waste Processing and Treatment, Bridge, Water Supply and Storage |
Article published date | 2026-05-09 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Waste Processing and Treatment tenders in United States of America
- Coatings for Wet Well and Manholes
- Sole Source for Wedeco UV BulbsBallets
- Chambers Creek Regional Wastewater Treatment Plant BNR Aeration Basin Airflow Meters
- Annual Construction Contract For Utility Replacement 2022A
- FY23 Sewer Rehabilitation
- Fire Station 32 ADA Restroom Improvements
- Foothills Trail East Puyallup McMillin Trailhead Improvements
- Pipeline Trail Phase 1 Project
