E16 Lærdals tunnel – upgrading of tunnels - passenger transport
The scope, dates and status of this tender. A free account opens every field.
Source: TED Europa
The 24.5 km long Lærdal tunnel on the E16 between Aurland and Lærdal in Vestland county shall be upgraded. The tunnel does not meet all requirements in the Tunnel Safety Regulations, and the requirements for electrical lift have changed in accordance with the tunnel service in the year 2000. There are encompassing measures that must be implemented in order for the tunnel to meet the current standa
- Status
- Closed
- Sector
- Tunnel, Mass Transit, Road
- Location
- Lærdal, Norway
- Updated
- 3 Nov 2026
- Source
- TED Europa
ConstructChat
Ask ConstructChat about E16 Lærdals tunnel – upgrading of tunnels - passenger transport
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | contract notice |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | The 24.5 km long Lærdal tunnel on the E16 between Aurland and Lærdal in Vestland county shall be upgraded. The tunnel does not meet all requirements in the Tunnel Safety Regulations, and the requirements for electrical lift have changed in accordance with the tunnel service in the year 2000. There are encompassing measures that must be implemented in order for the tunnel to meet the current standard requirements. The blasting work in the main course shall be carried out as night work, and during this period the tunnel will be closed from 18:00 to 06:00. This is a very invasive measure, especially considering local traffic, which in reality does not have enough re-injection alternatives. As mitigating measures, a public transport facility shall therefore be set up between Aurland and Lærdal, in the afternoon/evening. Passenger transport shall go through a closed tunnel with ongoing construction work. The transport shall go on a scheduled route and passengers must book a place on a transport route. Before kvar trip, the construction hire must be contacted in order to clear that it is passable through the tunnel. Drivers must be subject to special training with HSE review before the work starts. |
Original sector | Transport services (excl. Waste transport) |
Location
Country | Norway |
City | Lærdal |
Source
Source | TED Europa |
URL |
More Details
Record type | Tender |
Sector | Tunnel, Mass Transit, Road |
Article published date | 2026-03-25 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Tunnel tenders in Norway
- Contract - 420768 Fossumdalen stage 5-6, Pipeline route.
- BME EEA 2026-06 Framework agreement for the operation and maintenance of Small pudding foot and cycle bridges.
- Prequalification R01844 - Rock protection and mountain cleaning
- Washing machines for Levanger Hospital, Helse Nord-Trøndelag.
- Contract submarine pipelines Stad ship tunnel
- Maintenance contract, tunnels in the north
- Operation and maintenance of electrotechnical installations - E6 Trøndelag
- County road 48 Fossenbratte tunnel - upgrading of tunnels
