E39 Fløyfjell tunnel, upgrading emergency stations and CRM installations
Contract notice · Norway · Last reported Nov 2025
Source: TED Europa
The Norwegian Public Roads Administration currently has challenges with keeping the existing technical installations in the Fløyfjell tunnel in operation. The automation plant lacks access to critical spare parts and emergency stations connected to the tunnel has exceeded its lifetime. The existing installations are old and compound, this involves a high risk of errors and system failures. The upg
- Status
- Closed
- Sector
- Tunnel, Road, Power Generation (CCGT)
- Location
- Norway
- Updated
- 3 Nov 2026
- Source
- TED Europa
ConstructChat
Ask ConstructChat about E39 Fløyfjell tunnel, upgrading emergency stations and CRM installations
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | contract notice |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | The Norwegian Public Roads Administration currently has challenges with keeping the existing technical installations in the Fløyfjell tunnel in operation. The automation plant lacks access to critical spare parts and emergency stations connected to the tunnel has exceeded its lifetime. The existing installations are old and compound, this involves a high risk of errors and system failures. The upgrading project must be carried out without significantly touching the existing installations. The E39 Fløyfjell tunnel is located in Bergen municipality and is the main thoroughfare from the north and east to the centre of Bergen. The southern lane (towards the centre) was opened for traffic in 1989 and has a length of 3,195 metres. The northern lane (from the centre) was opened for traffic in 1988 and has a length of 3,825 metres. Annual daily traffic (ÅDT) for the tunnel was approx. 48,000 in 2024. Work to be carried out (not exhaustively): New automation installations, new emergency power supply and new emergency stations shall be established and commissioned before the old facility can be removed. The automation installations shall have the capacity to handle the complete tunnel installations. New emergency power installations shall be established in new technical rooms that are supplied directly from respective network station, with new subscriptions. New conveying roads shall be established from new emergency power rooms towards new pipes in the new banquet in the tunnel. |
Original sector | Construction work, Construction work, Construction work, Software package and information systems |
Location
Country | Norway |
Source
Source | TED Europa |
URL |
More Details
Record type | Tender |
Sector | Tunnel, Road, Power Generation (CCGT) |
Article published date | 2025-11-27 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Tunnel tenders in Norway
- Contract - 420768 Fossumdalen stage 5-6, Pipeline route.
- BME EEA 2026-06 Framework agreement for the operation and maintenance of Small pudding foot and cycle bridges.
- Prequalification R01844 - Rock protection and mountain cleaning
- Washing machines for Levanger Hospital, Helse Nord-Trøndelag.
- Contract submarine pipelines Stad ship tunnel
- Maintenance contract, tunnels in the north
- Operation and maintenance of electrotechnical installations - E6 Trøndelag
- County road 48 Fossenbratte tunnel - upgrading of tunnels
