logo

E39 Fløyfjell tunnel, upgrading emergency stations and CRM installations

Contract notice · Norway · Last reported Nov 2025

Source: TED Europa

Tender
Contract Notice

The Norwegian Public Roads Administration currently has challenges with keeping the existing technical installations in the Fløyfjell tunnel in operation. The automation plant lacks access to critical spare parts and emergency stations connected to the tunnel has exceeded its lifetime. The existing installations are old and compound, this involves a high risk of errors and system failures. The upg

Status
Closed
Sector
Tunnel, Road, Power Generation (CCGT)
Location
Norway
Updated
3 Nov 2026
Source
TED Europa

ConstructChat

Ask ConstructChat about E39 Fløyfjell tunnel, upgrading emergency stations and CRM installations

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “E39 Fløyfjell tunnel, upgrading emergency stations and CRM installations” is a tender record in Taiyo, linked to the Tunnel sector. It is issued for works, goods, or services related to Norway.

Participants

Not available for this record.

Status

Original status

contract notice

Taiyo status

Closed

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

The Norwegian Public Roads Administration currently has challenges with keeping the existing technical installations in the Fløyfjell tunnel in operation. The automation plant lacks access to critical spare parts and emergency stations connected to the tunnel has exceeded its lifetime. The existing installations are old and compound, this involves a high risk of errors and system failures. The upgrading project must be carried out without significantly touching the existing installations. The E39 Fløyfjell tunnel is located in Bergen municipality and is the main thoroughfare from the north and east to the centre of Bergen. The southern lane (towards the centre) was opened for traffic in 1989 and has a length of 3,195 metres. The northern lane (from the centre) was opened for traffic in 1988 and has a length of 3,825 metres. Annual daily traffic (ÅDT) for the tunnel was approx. 48,000 in 2024. Work to be carried out (not exhaustively): New automation installations, new emergency power supply and new emergency stations shall be established and commissioned before the old facility can be removed. The automation installations shall have the capacity to handle the complete tunnel installations. New emergency power installations shall be established in new technical rooms that are supplied directly from respective network station, with new subscriptions. New conveying roads shall be established from new emergency power rooms towards new pipes in the new banquet in the tunnel.

Original sector

Construction work, Construction work, Construction work, Software package and information systems

Location

Country

Norway

Source

Source

TED Europa

URL

More Details

Record type

Tender

Sector

Tunnel, Road, Power Generation (CCGT)

Article published date

2025-11-27

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender