E45 Kløfta – Improvement and construction of the section E01 Preparatory work Alta – Su gustavevuopme
The scope, dates and status of this tender. A free account opens every field.
Source: TED Europa
The contract work in this contract consists of a open air zone in the northern part of the E45 Kløfta project. A new road shall be constructed, which starts approx. 1.1 km north of the new bridge over the Eiby River. • Forest clearing the entire route, as well as a landfill and road to a landfill site. • Alterations of the current road to the existing road in the southern part. • An interim bridge
- Status
- Closed
- Sector
- Power Generation (CCGT), Bridge, Road
- Location
- Norway
- Updated
- 3 Nov 2026
- Source
- TED Europa
ConstructChat
Ask ConstructChat about E45 Kløfta – Improvement and construction of the section E01 Preparatory work Alta – Su gustavevuopme
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | contract award notice |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | The contract work in this contract consists of a open air zone in the northern part of the E45 Kløfta project. A new road shall be constructed, which starts approx. 1.1 km north of the new bridge over the Eiby River. • Forest clearing the entire route, as well as a landfill and road to a landfill site. • Alterations of the current road to the existing road in the southern part. • An interim bridge/road to a bridge and cradle in the north shall also be constructed, with crossing. of the Eiby river. • Preparation of landfill sites. As well as a road to the landfill approx. 3 km north of the site start at Garajohka. • The transmission of electricity is carried out under the direction of the line owner who is Alut. The new E45 shall be constructed as a road with main road standard with dimensioning class H1, road width 9 metres and a speed limit of 90 km/h. The traffic on the stretch has an annual daily traffic count of approx. 900, with a heavy traffic share of 22%. The project will be implemented model-based. Tenderers shall use professional models as work basis and to obtain placement and stitching data. In addition there are drawings that provide supplementary information on details. |
Original sector | Construction work, Construction work, Construction work, Construction work |
Budget |
Location
Country | Norway |
Source
Source | TED Europa |
URL |
More Details
Record type | Tender |
Sector | Power Generation (CCGT), Bridge, Road |
Article published date | 2026-01-20 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Power Generation (CCGT) tenders in Norway
- Contract - 420768 Fossumdalen stage 5-6, Pipeline route.
- E134 Ølen - Mørkli
- Full power system for sepraration of waste water and surface water on existing pipes etc.
- Snow clearing of lot 1326 Tromvik - piers and outdoor areas
- Framework agreement for consultancy and engineering design services for the Joint Project Arna - Stanghelle - second notice.
- 25/02800 - Procurement of a HPGe detector for DSA
- DLE TIlsynstjenester for Nettalliansen
- Market Assessment - Availability of Technical Expertise in Power Transformers and Shunt Reactors
