E9451 - Operation and maintenance contract - Electro contract Trøndelag 2026 - 2031
The scope, dates and status of this tender. A free account opens every field.
Source: TED Europa
The assignment comprises operational and maintenance assignments connected to electrical installations, on national roads and national foot/cycle paths, with the accompanying side facilities, side areas, equipment and installations in Oppdal, Rennebu, Midtre Gauldal, Melhus, Trondheim, Malvik, Stjørdal, Levanger, Verdal, Inderøy, Steinkjer, Snåsa, Grong, Namsskogan, Meråker, Heim, Orkland, Skaun m
- Status
- Closed
- Sector
- Road
- Location
- Norway
- Updated
- 3 Nov 2026
- Source
- TED Europa
ConstructChat
Ask ConstructChat about E9451 - Operation and maintenance contract - Electro contract Trøndelag 2026 - 2031
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | contract notice |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | The assignment comprises operational and maintenance assignments connected to electrical installations, on national roads and national foot/cycle paths, with the accompanying side facilities, side areas, equipment and installations in Oppdal, Rennebu, Midtre Gauldal, Melhus, Trondheim, Malvik, Stjørdal, Levanger, Verdal, Inderøy, Steinkjer, Snåsa, Grong, Namsskogan, Meråker, Heim, Orkland, Skaun municipalities in accordance with the D2-V and D2-S20. The geographical area is shown in D2-S01 The work will be settled with a round sum for round sum processes, in accordance with amounts and unit prices for other processes and as maths work in accordance with hourly rates for crews and machines. The contract period is from 01.09.2026 (00:00) to 31.08.2031 (24:00) for all the assignments that have been described. By agreement, the parties can extend the contract for a period of further 12, 24 or 36 months, cf. chapter C3, point 21. The Builder has the option to extend the contract by 12 months, from 1 September in the year the contract was agreed to end (i.e. either at the end of the original contract period, or at the end of the extended contract period in accordance with the previous section), up to and including 31 August the following year. If the contract is extended in accordance with chapter C3, point 21, the extended contract period will run until 31 August, 24.00. the contract in question to be extended to. |
Original sector | Construction work, Public utilities |
Location
Country | Norway |
Source
Source | TED Europa |
URL |
More Details
Record type | Tender |
Sector | Road |
Article published date | 2026-03-07 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
