East Lake Booster Pump Station (BPS) Relocation
Bids closed Mar 2026 · Georgia · Last reported Feb 2026
The Project consists of the following major elements: pre-construction consultation and construction of a replacement of the existing East Lake BPS with a new BPS on the existing site, as well as approximately 5,000 linear feet (LF) of new water main outside of the existing BPS property (suction and discharge piping) to improve the system hydraulics. The new BPS is anticipated to have the followin
- Status
- Closed
- Sector
- Waste Processing and Treatment, Warehouse, Manufacturing (Industrial), Power Transmission, Residential, Water Supply and Storage, Power Generation (CCGT), Commercial
- Location
- Georgia, United States of America
- Updated
- 3 Nov 2026
- Source
- Georgia Procurement Registry
ConstructChat
Ask ConstructChat about East Lake Booster Pump Station (BPS) Relocation
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | awarded |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | The Project consists of the following major elements: pre-construction consultation and construction of a replacement of the existing East Lake BPS with a new BPS on the existing site, as well as approximately 5,000 linear feet (LF) of new water main outside of the existing BPS property (suction and discharge piping) to improve the system hydraulics. The new BPS is anticipated to have the following features: - Horizontal split case pumps inside new BPS building - Site piping designed to maintain the existing operations of the onsite ground storage tanks - Standby power generator with automatic transfer switch - The existing BPS interior will be demolished, and the building will be left for storage if possible - The new building will have a roll up door and crane system for pump removal/access, climate controlled electrical room with new switchgear and VFDs. |
Original sector | Construction / Public Works |
Location
Country | United States of America (USA) |
State | Georgia |
Source
Source | Georgia Procurement Registry |
URL |
More Details
Record type | Tender |
Sector | Waste Processing and Treatment, Warehouse, Manufacturing (Industrial), Power Transmission, Residential, Water Supply and Storage, Power Generation (CCGT), Commercial |
Article published date | 2026-10-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Waste Processing and Treatment tenders in United States
- Concrete Pavement Services
- Place HMA overlay and replace AC surfacing.
- SB Minor B 03A4145 / Pedestrian Safety Improvement In Colusa, Sacramento, Sierra, Yolo, and Yuba Counties at Various Locations
- Lucky Street Water and Sewer Replacement
- Grantland Water Main Extension Between Shaw & Gettysburg
- Wilson Park Senior Adult Services Accessibility Improvements Project
- SB Minor B 05A3048 - Relocate Controller Assembly in Santa Cruz County
- SB Minor B 03A4143 - Install a Rectangular Rapid-Flashing Beacon in Placer County
