logo

Eastern Green Link 4 AC Digital Models Study

Sector: Power Generation (CCGT) • Location: United Kingdom

Source: Open Contracting Data Standard (OCDS)

Tender
Planned

the Employer is looking to appoint a Study Contractor. The Study Contractor will in a First Stage, develop the AC network models, and in a Second Stage, will work with an HVDC Contractor to test the EGL4 HVDC Link control system. Below is a brief description of the scope. In the First Stage, the Employer will provide the Study Contractor with AC network model information in DIgSILENT PowerFactory

Status
Prospective
Sector
Power Generation (CCGT)
Location
United Kingdom
Updated
3 Nov 2026
Source
Open Contracting Data Standard (OCDS)

ConstructChat

Ask ConstructChat about Eastern Green Link 4 AC Digital Models Study

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “Eastern Green Link 4 AC Digital Models Study” is a tender record in Taiyo, linked to the Power Generation (CCGT) sector. It is issued for works, goods, or services related to United Kingdom.

Participants

Not available for this record.

Status

Original status

planned

Taiyo status

Prospective

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

the Employer is looking to appoint a Study Contractor. The Study Contractor will in a First Stage, develop the AC network models, and in a Second Stage, will work with an HVDC Contractor to test the EGL4 HVDC Link control system. Below is a brief description of the scope. In the First Stage, the Employer will provide the Study Contractor with AC network model information in DIgSILENT PowerFactory and PSCAD software. By March 2028, the Study Contractor shall: • Perform multi-infeed interaction factor (MIIF) and unit interaction factor (UIF) studies, identify the AC network nodes remote from the EGL4 converter stations which can be reduced to network equivalents, and prepare PowerFactory and PSCAD models of AC network as viewed from the EGL4 converter stations. • Replace confidential AC network plant models in PowerFactory and PSCAD networks with generic plant models. The generic plant models shall be designed and parameterised to replicate the confidential plant model performance, and this will be evidenced by a validation report for the approval of both the Employer and the HVDC Contractor. • Be responsible for obtaining the Non-Disclosure Agreements where required from third-party plant owners. The HVDC Contractor will design and develop the EGL4 HVDC Link specific models, based on the AC network models containing equivalenced plant models received from the Study Contractor. The HVDC Contractor will then share the EGL4 HVDC Link specific models with the Study Contractor. In the Second Stage, the Study Contractor shall: • Test the EGL4 HVDC Link specific models after integrating them into the PowerFactory and PSCAD network models developed in the First Stage. • Work with the HVDC Contractor to resolve any further issues related to dynamic performance and tuning of the EGL4 HVDC Link control system.

Location

Country

United Kingdom (UK)

Source

Source

Open Contracting Data Standard (OCDS)

URL

More Details

Record type

Tender

Sector

Power Generation (CCGT)

Article published date

2026-04-02

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender