logo

Eight ( 8 ) New ~ 11 , 500 GVW 4x4 SRW CNG Extended Cab with Standard Utility Bed

One of 10,000+ tenders Taiyo tracks in Tennessee.

Source: Knoxville Utilities Board (KUB) - Tennessee

Tender
Closed

KUB is receiving bids for Eight ( 8 ) New ~ 11 , 500 GVW 4x4 SRW CNG Extended Cab with Standard Utility Bed , Flip Top as specified . Participating vendors must download the specification sheet , fill it out in its entirety and return it with their bid submission . All pricing should be included in your su

Status
Closed
Sector
Power Transmission, Power Generation (CCGT)
Location
Knoxville, Tennessee, United States of America
Updated
3 Nov 2026
Source
Knoxville Utilities Board (KUB) - Tennessee

ConstructChat

Ask ConstructChat about Eight ( 8 ) New ~ 11 , 500 GVW 4x4 SRW CNG Extended Cab with Standard Utility Bed

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “Eight ( 8 ) New ~ 11 , 500 GVW 4x4 SRW CNG Extended Cab with Standard Utility Bed” is a tender record in Taiyo, linked to the Power Transmission sector. It is issued for works, goods, or services related to Knoxville, Tennessee, United States of America.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

KUB is receiving bids for Eight ( 8 ) New ~ 11 , 500 GVW 4x4 SRW CNG Extended Cab with Standard Utility Bed , Flip Top as specified . Participating vendors must download the specification sheet , fill it out in its entirety and return it with their bid submission . All pricing should be included in your submitted price , including any fees and shipping . This purchase will be FOB destination . See more

Location

Country

United States of America (USA)

State

Tennessee

City

Knoxville

Source

Source

Knoxville Utilities Board (KUB) - Tennessee

URL

More Details

Record type

Tender

Sector

Power Transmission, Power Generation (CCGT)

Article published date

2026-05-10

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender