EKFB JV - Highways Works NC2A
Sector: Hydro • Location: United Kingdom
Source: Contracts Finder
NC2A is the North Chilterns to Aylesbury section of C23, a part of the HS2 project managed by the EKFB Joint Venture.We are seeking a specialist subcontractor to undertake the following works within the NC2A section:The Subcontract Works includes for the provision of all management, labour, materials, plant and equipment, supervision, and other resources necessary and ancillary to safely complete
- Status
- Prospective
- Sector
- Hydro, Road
- Location
- United Kingdom
- Updated
- 3 Nov 2026
- Source
- Contracts Finder
ConstructChat
Ask ConstructChat about EKFB JV - Highways Works NC2A
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | opportunity |
Taiyo status | Prospective |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | NC2A is the North Chilterns to Aylesbury section of C23, a part of the HS2 project managed by the EKFB Joint Venture.We are seeking a specialist subcontractor to undertake the following works within the NC2A section:The Subcontract Works includes for the provision of all management, labour, materials, plant and equipment, supervision, and other resources necessary and ancillary to safely complete the construction and handover of Highways/ footpaths works, as described in the specifications, drawings, HS2 standards Requirements and local authority specifications. The Subcontractor will be responsible for the temporary works design and temporary works construction as further detailed in this document.The subcontractor will be responsible for all permanent and temporary works relating to the Highways realignment unless otherwise excluded. The works included as part of this scope to be delivered by the subcontractor are:- Site clearance including Removal of existing drainage, kerbs, footpath, highway pavement, verges within permanent design location.- Earthworks including excavation to formation, soft spot treatment if required.- Drainage system, including temporary excavations, supply and installation of chambers, gullies, headwalls, carrier drains, filter and fin drains, fin drains, ditches, hydro brake system, non-return valve connection to existing drainage systems.- Service ducts: including supply and installation of service ducts, connections and chambers.- Road formation (asphalt surfacing by others): this includes supply and installation of geotextile separation materials highways and footways kerbs. Installation of capping and subbase layersPlease express your interest within this package. |
Location
Country | United Kingdom (UK) |
Source
Source | Contracts Finder |
URL |
More Details
Record type | Tender |
Sector | Hydro, Road |
Article published date | 2026-05-30 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Hydro tenders in United Kingdom
- OO Works - Seagrass Planting SEPD - Multi Site 1226
- Shetland 2 HVDC Converter Technology
- OO Services - Woodland Restoration - SEPD 0327
- NEPO210 Highways Surfacing Works
- LT360 Spittal to Peterhead HVDC Cables (Construction) - Multi-site 1229
- The Mercian Trust Shire Oak Academy Science Block Window Replacement
- FW Supply & Deliver - 11kV Indoor Switchgear - Multi Site 0637
- Reservoir Act S10 Statutory Works - Reprofiling of Reservoir Dam at Osbornes Pond, Shipley Country Park
