logo
TenderOpen

Electric CostofService Analysis Rate Design Study

Sector: Power Generation (CCGT) • Location: Pasadena, California, United States of America

Source: Open Gov Tenders

Status
Closed
Sector
Power Generation (CCGT), Stadium, Water Supply and Storage, Power Transmission, Government
Location
Pasadena, California, United States of America
Updated
22 Jul 2026
Source
Open Gov Tenders

ConstructChat

Ask ConstructChat about Electric CostofService Analysis Rate Design Study

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

4 Q
The tender “Electric CostofService Analysis Rate Design Study” is a tender record in Taiyo, linked to the Power Generation (CCGT) sector. It is issued for works, goods, or services related to Pasadena, California, United States of America.

Participants

Sponsoring Agency

Status

Original status

open

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

<p style="line-height: 115%; margin: 0in 0in 8pt; font-size: 11pt;"><span style="font-size: 14px;">The City of Pasadena&rsquo;s Water and Power Department (&ldquo;PWP&rdquo;) is conducting a search for an experienced technical/financial consulting firm (&ldquo;Contractor,&rdquo; "Consultant" or "Proposer") to complete an Electric Cost-of-Service Analysis (&ldquo;ECOS&rdquo;), and develop and design a robust financial model and rate structure.&nbsp;</span><span style="font-size: 14px;">The purpose of this project is to develop a near-term rate restructuring proposal that ensures revenue adequacy and fair and equitable allocation of costs while balancing customer affordability and impacts to customers. These efforts are expected to produce an electric rate structure that reflects Pasadena&rsquo;s forward-thinking policy goals and community values, including Pasadena's goal to convert to 100% Carbon-Free Energy by 2030. In concert with these goals, PWP is looking to explore rate structures and pricing incentives that will include options for clean energy technology and accommodate evolving trends towards &ldquo;bi-directional&rdquo; electrical grid usage by PWP customers, including customer-owned generation and storage devices. The resulting rate structure must comply with California Law. </span><span style="font-size: 14px;">The project is expected to result in a financial planning model that can be used for rate design under different scenarios. The financial model will also be developed to support future decision making for rates and structures as conditions change; the plan will reflect iterative design components that will provide PWP with resilient financial resources in order to support long-term sustainability. The project will also entail extensive engagement with the public to&nbsp; garner understanding of and support for the chosen rate design.</span><p style="margin: 0in; font-size: 11pt;"><span style="font-size: 14px;">Proposals are requested from Contractors that have a demonstrated ability to perform the tasks identified in the &ldquo;Scope of Work&rdquo; section contained within this Request for Proposal (&ldquo;RFP&rdquo;).</span>

Location

Country

United States of America (USA)

State

California

City

Pasadena

Source

Source reliability

High

Source

Open Gov Tenders

URL

More Details

Record type

Tender

Sector

Power Generation (CCGT), Stadium, Water Supply and Storage, Power Transmission, Government

Article published date

2024-01-05

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender