Electric CostofService Analysis Rate Design Study
Sector: Power Generation (CCGT) • Location: Pasadena, California, United States of America
Source: Open Gov Tenders
- Status
- Closed
- Sector
- Power Generation (CCGT), Stadium, Water Supply and Storage, Power Transmission, Government
- Location
- Pasadena, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Open Gov Tenders
ConstructChat
Ask ConstructChat about Electric CostofService Analysis Rate Design Study
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
Sponsoring Agency |
Status
Original status | open |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | <p style="line-height: 115%; margin: 0in 0in 8pt; font-size: 11pt;"><span style="font-size: 14px;">The City of Pasadena’s Water and Power Department (“PWP”) is conducting a search for an experienced technical/financial consulting firm (“Contractor,” "Consultant" or "Proposer") to complete an Electric Cost-of-Service Analysis (“ECOS”), and develop and design a robust financial model and rate structure. </span><span style="font-size: 14px;">The purpose of this project is to develop a near-term rate restructuring proposal that ensures revenue adequacy and fair and equitable allocation of costs while balancing customer affordability and impacts to customers. These efforts are expected to produce an electric rate structure that reflects Pasadena’s forward-thinking policy goals and community values, including Pasadena's goal to convert to 100% Carbon-Free Energy by 2030. In concert with these goals, PWP is looking to explore rate structures and pricing incentives that will include options for clean energy technology and accommodate evolving trends towards “bi-directional” electrical grid usage by PWP customers, including customer-owned generation and storage devices. The resulting rate structure must comply with California Law. </span><span style="font-size: 14px;">The project is expected to result in a financial planning model that can be used for rate design under different scenarios. The financial model will also be developed to support future decision making for rates and structures as conditions change; the plan will reflect iterative design components that will provide PWP with resilient financial resources in order to support long-term sustainability. The project will also entail extensive engagement with the public to garner understanding of and support for the chosen rate design.</span><p style="margin: 0in; font-size: 11pt;"><span style="font-size: 14px;">Proposals are requested from Contractors that have a demonstrated ability to perform the tasks identified in the “Scope of Work” section contained within this Request for Proposal (“RFP”).</span> |
Location
Country | United States of America (USA) |
State | California |
City | Pasadena |
Source
Source reliability | High |
Source | Open Gov Tenders |
URL |
More Details
Record type | Tender |
Sector | Power Generation (CCGT), Stadium, Water Supply and Storage, Power Transmission, Government |
Article published date | 2024-01-05 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Power Generation (CCGT) tenders in United States of America
- RFP - Thurston County Lake Management Districts Submerged Aquatic Vegetation Control
- Coatings for Wet Well and Manholes
- Security Hardware Services
- 23B49SR Marine Science Center Turtle Canopy
- Purchase and Supply of Engine Oil for the McIntosh Reciprocating Engine Project MREP
- Chambers Creek Regional Wastewater Treatment Plant BNR Aeration Basin Airflow Meters
- Se Dixie Highway County Road A1A Utility Relocation Project
- PreQualification of Bidders for Chaboya Improvements
