Electric Utility Network Modeling Software and Implementation Services
Sector: Power Transmission • Location: Oklahoma, United States of America
Source: Oklahoma Purchasing Group
Proposers shall provide all software , professional services , implementation support , and training necessary to successfully deliver the services described below . Proposers may recommend additional tasks or refinements ; however , all minimum requirements must be met . 2 . 1 Existing Environment Overview Stillwater Electric
- Status
- Closed
- Sector
- Power Transmission, Power Generation (CCGT)
- Location
- Oklahoma, United States of America
- Updated
- 3 Nov 2026
- Source
- Oklahoma Purchasing Group
ConstructChat
Ask ConstructChat about Electric Utility Network Modeling Software and Implementation Services
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | Proposers shall provide all software , professional services , implementation support , and training necessary to successfully deliver the services described below . Proposers may recommend additional tasks or refinements ; however , all minimum requirements must be met . 2 . 1 Existing Environment Overview Stillwater Electric Utility currently maintains a complex enterprise geodatabase serving as the system of record for electric distribution assets . The environment includes , but is not limited to : ESRI ArcGIS Enterprise ( system of record for spatial data ) Existing geometric network Integration with multiple independent systems , including customer information , outage management , and engineering analysis tools Approximately 102 , 000 features across numerous asset classes The selected proposer shall work within this enterprise environment and coordinate closely with SUA , City of Stillwater GIS , IT , and Electric Department staff . 2 . 2 Assessment and Pre - Conversion Analysis The proposer shall : Evaluate SUA ’ s existing electric distribution feature dataset Identify data gaps , risks , and pre - conversion cleanup requirements Provide written recommendations for preparing the data for conversion to the ESRI Utility Network 2 . 3 Data Cleanup and Validation In coordination with SUA staff , the proposer shall perform or support pre - conversion data cleanup , including at a minimum the following validation checks : Duplicate feature identification Geographic coincident features Overhead / underground transition validation Illegal or invalid geometry Attribute values outside defined domains Identification of critical attribute issues Geometric overstrike Connectivity validation Phase and phase - orientation validation Unit record and parent - feature validation Deliverables shall include : Summary report of checks performed , number of features evaluated , and errors identified by severity Detailed error listings for each validation routine An error database suitable for review , correction tracking , and audit purposes 2 . 4 Utility Network Design and Migration The proposer shall : Design an ESRI Utility Network prototype for electric distribution compatible with ArcGIS version 11 . x and higher Develop detailed data mapping from existing source data to Utility Network feature classes , asset groups , asset types , and attributes Provide a comprehensive migration plan identifying recommended migration approach ( es ) Perform migration of all approved data into the Enterprise Geodatabase Utility Network schema |
Location
Country | United States of America (USA) |
State | Oklahoma |
Source
Source | Oklahoma Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Power Transmission, Power Generation (CCGT) |
Article published date | 2026-04-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Power Transmission tenders in United States of America
- RFP - Thurston County Lake Management Districts Submerged Aquatic Vegetation Control
- Coatings for Wet Well and Manholes
- Security Hardware Services
- Se Dixie Highway County Road A1A Utility Relocation Project
- PreQualification of Bidders for Chaboya Improvements
- Utility Management System and Services UMSS
- FY2023 Patch Truck
- Desert Willow Perimeter Landscape and Lighting Rehabilitation Phase 2 Project
