Electrical & Mechanical Maintenance ServicesWater Treatment Plant & Wastewater Treatment Plant
Sector: Metal • Location: Tennessee, United States of America
Source: Tennessee Purchasing Group
THE PURPOSE OF THIS BID IS TO OBTAIN A CONTRACTOR TO PROVIDE MAINTENANCE SERVICES FOR THE TOWN ' S WATER AND WASTEWATER MECHANICAL EQUIPMENT AND ELECTRIC MOTORS . THE MOTOR REPAIR SHOP MUST MAINTAIN A VALID TENNESSEE MECHANICAL CONTRACTOR ’ S LICENSE . IF MOTOR REPAIR WORK IS NOT TO BE CONDUCTED IN HOUSE ,
- Status
- Closed
- Sector
- Metal, Water Supply and Storage, Manufacturing (Industrial), Commercial
- Location
- Tennessee, United States of America
- Updated
- 3 Nov 2026
- Source
- Tennessee Purchasing Group
ConstructChat
Ask ConstructChat about Electrical & Mechanical Maintenance ServicesWater Treatment Plant & Wastewater Treatment Plant
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | THE PURPOSE OF THIS BID IS TO OBTAIN A CONTRACTOR TO PROVIDE MAINTENANCE SERVICES FOR THE TOWN ' S WATER AND WASTEWATER MECHANICAL EQUIPMENT AND ELECTRIC MOTORS . THE MOTOR REPAIR SHOP MUST MAINTAIN A VALID TENNESSEE MECHANICAL CONTRACTOR ’ S LICENSE . IF MOTOR REPAIR WORK IS NOT TO BE CONDUCTED IN HOUSE , THE MOTOR REPAIR SHOP MUST BE APPROVED BY A REPRESENTATIVE OF THE TOWN OF SMYRNA . A PANEL OF INSPECTORS FROM THE TOWN MAY VISIT AND INSPECT THE FACILITIES BEFORE AWARD OF BID . ALL MOTOR REPAIR WORK MUST BE COMPLIANT WITH EASA STANDARDS AND SPECIFICATIONS , SUCH AS ANSI / EASA AR100 , TO ENSURE THE REPAIR PROCESS MAINTAINS THE EFFICIENCY AND RELIABILITY OF THE MOTOR , FOLLOWING BEST TRADE PRACTICES AND PROCEDURES . ELECTRIC MOTOR REWIND SPECIFICATION ( Motors only ) All electric motor stator rewinding shall include labor and partial material for the following scope of work : 1 . Dismantle , test , and strip coils 2 . Fabricate and install coils . 3 . Connect VPI valves 4 . Assemble , test , and paint . 5 . A 90 - day warranty against defects in materials and workmanship shall be provided by the Contractor . 6 . Dynamic balance , furnishing and installing bearings , metalizing , machine work , and new leads are additions to the scope . 1 . Before dismantling the motor , inspect the motor by turning the rotor to identify a sprung shaft , rubbing , bearing noise or roughness , excessive end play , or other problems , and record findings . Perform electrical tests on the motor and dismantle it for inspection and cleaning . Stators , wound rotors , and armatures to be rewound shall be burned and stripped at a maximum controlled temperature of 750 degrees F . to prevent damage to the lamination and frames . 2 . All motor windings will be steam cleaned using detergent and rinsed with clean steam . The motor will be baked dry in a temperature - controlled oven following standard shop procedures . After the first bake , allow motor windings to cool to normal temperature . Perform a megger test on the windings . The minimum acceptable reading is 100 megohms at 1000 volts DC of operating voltage . If reading is unacceptable , inspect motor windings for cleanliness . If windings are not clean ( i . e ., dirt , grease , detergent residue ), steam clean motor windings again . If windings are clean , bake them again in a temperature - controlled oven following standard shop procedures . After the second bake , allow motor windings to cool to normal temperature . Perform a megohmmeter test on the windings . If readings are unacceptable , then contact the Plant Manager for further instructions . If readings are acceptable , dip and bake motor windings . 3 . After stripping , examine and test laminations for blow holes , shorts , and hot spots . All short and / or laid - over laminations shall be repaired before rewinding . Sandblast and thoroughly clean slots and frames , check for cracks or broken welds , repair as necessary , and perform an iron core loss test . Check the rotor for cracks , flaws , bearing fit , and fan condition . Check air gaps for condition and correct distance . Determine bearing fit at bearing locations in the end bells and on the shaft . 4 . Check nameplate date and purchase order to determine the type and class of insulation of new coils . Class " N " insulation and the VPI process and epoxy resin are required . Fabricate and install coils to conform to OEM Factory standards and specifications or better . Every coil is to be tied on both sides of the winding and formed neatly and compactly . All insulating varnish shall have a heat aging life of not less than 10 , 000 hours at maximum operating temperature . Class " H ", epoxy insulation is standard . If in doubt , contact the Town of Smyrna for directions before continuing with the work . 5 . Silicone rubber - insulated Class " H " leads are standard . On 230 / 460 motors , leads shall be for the higher voltage and suitably sealed at the point of exit from the stator on TEFC and explosion - proof motors . 6 . The vacuum pressure impregnation ( VPI ) Epoxy Resin process is to be used , unless instructed otherwise . 7 . After varnishing and baking , check stator insulation resistance at twice the rated voltage or 500 DC Volts for motors under 440 volts and 1000 DC Volts on motors 440 Volts or greater . In general , a minimum value of 100 megohms resistance for 250 Volts AC and under , and 200 megohms for 251 to 600 Volts AC motors is required with the entire winding to ground , 1 minute duration , temperature 30 degrees C . 8 . Check the rotor between centers on a lathe for runout , which should not exceed 0 . 003 inches or 0 . 0005 inches after resurfacing . Check bearing mount areas for condition and fit using the bearing manufacturer ' s data for dimensions and tolerances . 9 . All NEMA frame A / C electric motor rotors 5 H . P . and larger are to be dynamically balanced . For motors 50 H . P . and larger balanced to the " GOOD " range , according to the Vibration Frequency Curve , the spectrum analysis method is required , and copies of the vibration spectrum plots from the test stand runs are to be furnished to the Town . The spectra should be taken in the horizontal , vertical , and axial directions on both bearings . On ball bearing motors , the range should be from 2 mils to 4 mils . If there are questions regarding these requirements , consult the Town before proceeding . 10 . Use loose - fit Bearing Fit Tolerance Chart bearings on all 3600 RPM motors . Check for a tight fit between bearing and bearing housing , which should be 0 . 001 inches of interference , up to 0 . 0005 inches per bearing outside diameter , for a secure fit . Use identical replacement bearings , unless otherwise specified . 11 . On all motors , use OEM - recommended grease , unless otherwise specified , and plainly identify on the motor as to the type of grease used . 12 . A non - hardening sealant compound , RTV silicone , Permatex # 2 , or equal is to be used during assembly on all end bells , bearing caps , etc ., to prevent moisture and fumes from entering the motor on all TEFC or explosion - proof motors . Check the fan and covers , and repair or replace any defective components . 13 . All motors are to be repainted after rewinding or repairs . Use appropriate standard engineering specifications and applicable surface preparation . Use the standard machine gray color . 14 . Perform a megger test after assembly to ensure there was no damage to the motor during assembly . Allow the motor to run long enough to reach a normally stable temperature . Check bearings for noise and excessive temperature , and do a vibration profile and run test of the motor . See preceding requirements for spectrum analysis of vibration . Record no - load amperage for phase balance and comparison to the full load current rating of the motor . Record RPM , bearing temperatures , and coast down . Check and mark the magnetic center on the shaft for installation reference , if applicable . |
Location
Country | United States of America (USA) |
State | Tennessee |
Source
Source | Tennessee Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Metal, Water Supply and Storage, Manufacturing (Industrial), Commercial |
Article published date | 2026-05-05 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Metal tenders in United States of America
- Token Creek Roof Replacements
- HVAC Ice Machine Servicing and Sheet Metal Fabrication
- Jail Courthouse Walkway Project
- RFP 887702021MF Rapid Response Fire Boat for Norfolk FireRescue
- Various Locations Sewer Replacement No. 9 [BID TABULATION]
- Millbrae Warehouse Loading Dock Repair
- Biosolids Digester Facilities - Southeast Treatment Plant T-...
- Electrical (C-10 License), San Francisco, San Mateo, Santa C...
