ELECTRICAL EQUIPMENT TESTING AND INSPECTION SERVICES
Sector: Power Generation (CCGT) • Location: Alabama, United States of America
Source: Alabama Purchasing Group
Jefferson County shall engage the services of a recognized independent testing firm , or independent electrical consulting firm to provide services , to inspect , test and / or calibrate electrical equipment in Jefferson County facilities . These services shall include short circuit and coordination studies as herein s
- Status
- Closed
- Sector
- Power Generation (CCGT), Telecommunications
- Location
- Alabama, United States of America
- Updated
- 3 Nov 2026
- Source
- Alabama Purchasing Group
ConstructChat
Ask ConstructChat about ELECTRICAL EQUIPMENT TESTING AND INSPECTION SERVICES
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | Jefferson County shall engage the services of a recognized independent testing firm , or independent electrical consulting firm to provide services , to inspect , test and / or calibrate electrical equipment in Jefferson County facilities . These services shall include short circuit and coordination studies as herein specified and small adjustments , tightening , and cleaning which is incidental to testing . The testing firm shall provide all material , equipment , labor , and technical supervision to perform such tests and inspection services . A written report , following each service , shall be submitted with status indication of each item of equipment tested and a recommendation of follow - up action . It is the intent of these tests to ensure that all electrical equipment is operational and within industry and manufacturer ' s tolerance and is installed in accordance with design specifications . The test and inspections shall determine suitability for energization and operation . The test shall include annual planned outages at facilities to verify system functionality and switchgear reliability . Specific testing includes high potential testing on cables , relay - testing calibration , insulation power factor testing , control wire function checkout , transformer saturation and polarity testing . In addition , testing and inspection of cabling , this connects the switchgear to other electrical circuits . |
Location
Country | United States of America (USA) |
State | Alabama |
Source
Source | Alabama Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Power Generation (CCGT), Telecommunications |
Article published date | 2026-05-10 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Power Generation (CCGT) tenders in United States of America
- RFP - Thurston County Lake Management Districts Submerged Aquatic Vegetation Control
- Coatings for Wet Well and Manholes
- Security Hardware Services
- 23B49SR Marine Science Center Turtle Canopy
- Purchase and Supply of Engine Oil for the McIntosh Reciprocating Engine Project MREP
- Chambers Creek Regional Wastewater Treatment Plant BNR Aeration Basin Airflow Meters
- Se Dixie Highway County Road A1A Utility Relocation Project
- PreQualification of Bidders for Chaboya Improvements
