Elk Co Lin / Empor Resurfac
Sector: Hydro • Location: Pennsylvania, United States of America
Source: Pennsylvania Purchasing Group
The total construction length is approximately 53 , 298 feet ( 10 . 1 miles ). For the removal of portions of the existing structure and construction involving strip seal dam , bridge barrier repair , hydrodemolition , concrete repairs , rebar installation , and bridge repairs as noted including approach slab and sleeper
- Status
- Closed
- Sector
- Hydro, Bridge, Steel, Rail, Cement, Road
- Location
- Pennsylvania, United States of America
- Updated
- 3 Nov 2026
- Source
- Pennsylvania Purchasing Group
ConstructChat
Ask ConstructChat about Elk Co Lin / Empor Resurfac
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | The total construction length is approximately 53 , 298 feet ( 10 . 1 miles ). For the removal of portions of the existing structure and construction involving strip seal dam , bridge barrier repair , hydrodemolition , concrete repairs , rebar installation , and bridge repairs as noted including approach slab and sleeper slab construction , roadway includes asphalt paving , pipe replacement , guide rail upgrades , and miscellaneous construction as indicated on the approved drawings included in the bid package . |
Location
Country | United States of America (USA) |
State | Pennsylvania |
Source
Source | Pennsylvania Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Hydro, Bridge, Steel, Rail, Cement, Road |
Article published date | 2026-05-09 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Hydro tenders in United States of America
- Landscaping (C-27 License), San Francisco, San Mateo, Santa ...
- Bay Corridor Transmission & Distribution - Phase 2 (2019) S...
- College Hill Reservoir Outlet Structure And Pipeline
- Bay Corridor Transmission and Distribution - Phase 3 (2019)
- Regional Groundwater Storage and Recovery
- Fillmore and Haight Street Intersection AWSS, Pavement, and ...
- REJECTED: Southeast Water Pollution Control Plant Power Feed...
- Turner Dam Spillway and Pond F3 East Erosion Repair
